3 .

l Attachment to I AECM-88/2-0001 I l

I

SUMMARY

OF ENVIRONMENTAL' PROTECTION PROGRAM i RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 1 l

FOR SIX MONTHS ENDING DECEMBER 31, 1987 l

Construction Highlights  ;

  • Unit 2 construction was suspended in September 1985 with l approximately 35% of field construction completed based on the estimated manhours needed to. complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and structural maintenance.

I Vehicular Movement

  • No "off limit" violations were observed during the reporting period. .

i

- Dust Control ,

  • No dust control violations were observed during the reporting ,

period.

Smoke Control i

)

  • No smoke violations occurred during the six-month reporting period.

Erosion Control

  • Rainfall was recorded on 34 occasions during the reporting period, with an accumulated total of 18.75 inches, i

Chemical & Solid Waste Control  !

t

  • No violations or improprieties of Mississippi vaste disposal regulations occurred.  ;

Noise Control

  • No excessive noise levels were detected during the reporting period.  ;

j l

8002050165 871231 PDR ADOCK 05000417 R pp l

l PENV EPP/ATT I - I bg j V

I a l,

Attachment Page 2 AECM-88/2-0001 Sediment Basins A & B

  • There were no construction-associated problems with Sediment Basins A or B during the reporting period. j l

Regional Groundwater Dewatering Wells

  • The 12 regional groundwater wells were read 13 times during the reporting period with no problems encountered. l
  • The perched aquifer wells were read monthly during the reporting period. No well exceeded the 109 feet Mean Sea Level design basis for GGNS, l Vegetation Survey l
  • No vegetational abnormalities were observed during the reporting i period.

Transmission Lines l

  • No erosion problems associated with the GGNS transmission lines were identified during the reporting period.

l 1

l I

J22 PENV EPP/ATT I - 2

CV.19 D Ktsah Ji IN[J@lcu January 29, 1988 U. S. Nuclear Pegulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report for Six Months Ending December 31, 1987 AECM-88/2-0001 Attached is a report entitled "Summary of Environmental Protection Prcgram Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending December 31, 1987". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Permit No. CPPP.-119.

Please contact my office if you have any questions concerning this report.

Your uly,

/

/ ~

p .

ODK:bms Attachment

/

cc: Mr. T. H. Cloninger (w/a) Mr. H. L. Thomas (w/o)

Mr. R. B. McGehee (w/a) Mr. R. C. Butcher (w/a)

Mr. N. S. Reynolds (w/a)

Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Comission Region 11 101 Marietta St. , N. W. , Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission 7920 Norfolk Avenue -

Bethesda, Maryland 20814 p r o a:m l x>m vunm mse l enmr AIA19e50LF itta Cc m n J16AECP88012601 - 1