Summary of Environ Protection Program Re Const of Unit 2 for 6-month Period Ending Dec 1987
ML20196A804
Person / Time
Site: Grand Gulf 
Issue date: 12/31/1987
From: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AECM-88-2-0001, AECM-88-2-1, NUDOCS 8802050165
Download: ML20196A804 (3)


Text

,

_ ~ _. -

l ef _

'l 3.

l Attachment to AECM-88/2-0001 I

SUMMARY

OF ENVIRONMENTAL' PROTECTION PROGRAM i

RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 1

l FOR SIX MONTHS ENDING DECEMBER 31, 1987 Construction Highlights Unit 2 construction was suspended in September 1985 with l

approximately 35% of field construction completed based on the estimated manhours needed to. complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and structural maintenance.

I Vehicular Movement No "off limit" violations were observed during the reporting period.

i

- Dust Control No dust control violations were observed during the reporting period.

Smoke Control i

)

No smoke violations occurred during the six-month reporting period.

Erosion Control Rainfall was recorded on 34 occasions during the reporting period, with an accumulated total of 18.75 inches, i

Chemical & Solid Waste Control t

No violations or improprieties of Mississippi vaste disposal regulations occurred.

Noise Control No excessive noise levels were detected during the reporting period.

j l

8002050165 871231 PDR ADOCK 05000417 R

pp l

l bg j

PENV EPP/ATT I - I V

I a

Attachment Page 2 AECM-88/2-0001 Sediment Basins A & B There were no construction-associated problems with Sediment Basins A or B during the reporting period.

j l

Regional Groundwater Dewatering Wells The 12 regional groundwater wells were read 13 times during the reporting period with no problems encountered.

The perched aquifer wells were read monthly during the reporting period.

No well exceeded the 109 feet Mean Sea Level design basis for GGNS, Vegetation Survey No vegetational abnormalities were observed during the reporting period.

Transmission Lines No erosion problems associated with the GGNS transmission lines were identified during the reporting period.

l 1

l J22 PENV EPP/ATT I - 2

CV.19 D Ktsah Ji IN[J@lcu January 29, 1988 U. S. Nuclear Pegulatory Commission Washington, D. C.

20555 Attention:

Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report for Six Months Ending December 31, 1987 AECM-88/2-0001 Attached is a report entitled "Summary of Environmental Protection Prcgram Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending December 31, 1987". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Permit No. CPPP.-119.

Please contact my office if you have any questions concerning this report.

Your

uly,

/

/

~

p ODK:bms

/

Attachment cc: Mr. T. H. Cloninger (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. B. McGehee (w/a)

Mr. R. C. Butcher (w/a)

Mr. N. S. Reynolds (w/a)

Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Comission Region 11 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission 7920 Norfolk Avenue Bethesda, Maryland 20814 p

r o a:m l x>m vunm mse l enmr AIA19e50LF itta Cc m n J16AECP88012601 - 1