ML20196A803

From kanterella
Jump to navigation Jump to search
Forwards General Ofc Emergency Implementing Procedure G0-EIP-138 & Document Transmittal Ack Form.W/O Encl
ML20196A803
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/21/1988
From: Harris R
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8812060115
Download: ML20196A803 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _

fo*,,,,

~ '

Alabama Power Company 600 North 18th Street Post Offic3 Box 2641

. Birmingham, Alabama 35291 Telephone 205 250-1000 Alabama Power bl

,n, a u '~

~

'J*

,,,ewgn eye,,e,,,,m November 21, 1988 t

l Docket No. 50-348 Docket No. 50-364 l

U. S. Nuclear Regulatory Comission Region II Suite 2900 101 Marietta Street, N. W.

Atlanta, GA 30323

)

Dear Sir:

i Enclosed in accordance with 10CFR50, Appendix E requirement is a copy of General Office Emergency Implementing Procedure GO-EIP-138. Also enclosed is a Document Transmittal Acknowledgment Form which we request that you sign and return in the self-addressed anvelope, so that we may i

verify yout' receipt of this document.

If you have any questions, please contact me at (205) 868-5757.

l d

O Rozell Harris l

RH:maf f

Enclosures:

GO-EIP-138 l

Acknowledgment Form Return Envelope xc:

File: A-27.9.1 V

I G812060115 8G1121 i

PDR ADOCK 05000348 F

PDC p

Y ru b s w u Y (Loc / b b k 0 l~* f a