_ _ _ _ _ _ _ _ _ _ _ _
h' **%
/
c UNITED STATES l'
- v. g6'i NUCLEAR REGULATORY COMMISSION e
e WASHINGTON. D. C. 20555
%...d)
EhCLOSURE P SAFETY EVALUATIOil REPORT C E h E P I C' llill V W.Tlll R' El'( PA RT 2 )
VEhDOR IhtlkFAtt' ROGkiWIR15't0RP0hl
- ----- --- pnty ynggSzgT3 y ------- hi}$)
70tTlrw. 50 ate 1.0,1tqf 0D0CT10ti On February 25. 1983, both of the strar, circuit breeners at Unit 1 of the Salert iuclear Power Pb at failed to open upon on autoriatic reactor trip sigral fror: the reactor protectieri systet.
This incident was terr.ir.ated rar.ually ty the operator etcut 30 setti.ds af ter the iriitietion of the autor.iatic trip s i g r.61.
The f ailure of the circuit breelers was deterriined to be related to the stithirig of the undervcittge trip attachr;ent. Prior to this incident, on February 22, 1983, at Unit 1 of the Salem Kuclear Power Plant, an autoratic trip sigral v.as g(nerated based on steat. generator icv-low level during plant start-up.
In this c6se, the reactor was tripped nanually by the operator alrost toir.cidentelly witn the autorootic trip.
fc110 wing these incidents, on February 08,19E3, the !!RC Executive Director for Oter6tions (ECC), directed the staff tc investigcte and report on the gerieric irplications of these occurrences at l' nit 1 of the Salen:iuclear Pc+er Plant. The results of the st3ff's inquiry into the generic in'plications of these eser.ts crt retcrted iri i;t'FEG 1000 %neric Ir:plicetiuns of the ATh'S Everas et the Saler, i:vtlear Power Plar.t".
As a result of this investigation, (hRC) requested (by Generic.etter 83-28 dated July E, 1983) the Corrissich r
til liter sees of ortr6tir g reetters, applicants for bn operatirc license, or.c tc1ders of consttuttier, perriits te respond to generic issues raised by the ar.alyses of these two ATL'S events.
This report is en evaluatico of the response subritted by Gulf States Utilities Corpany, tre licensee for the Piver Bend Station for item 2.1. (Part 2) of Generic le'ter 83-28.
The actual docuvents reviewed as part of this evaluation are listed in the referentes at the end of this report.
Item 2.1 (Part 2) requires the licensee to confirm that an interface has been establisted with the N!!! cr witt the vendors of each of the corror erts of the kesctor Trip Systern which includes:
o periodic coerunica' tion between the licensee / applicant and the NSSS or the vendors of each of the corponents of the Reactor Trip Syster, er d.
8912060066 8811ja hDR ADOCK 0300o4G5 PDR
]
t 2-i i
o a system of pcsitive feedback which confirms receipt by the lictrsee/ applicant of transmittels of vendor technical inferration.
i 2.0 QALUATION j
The licensee for Rive: Eend Station (Gulf States Utilities Coropany) provided I
responses to Generir, Letter 83-?8, Item 2.1 (Part 2) in.subrittels dated ic.vtrber 1,1983, A Jgust 3,1984 and August 11, 1988.
In the first suba'ittal, the licensee cor.ciitted to respos;d to this iten.. The second suteittel described their interface program with their i:SSS vendor (G.E.), sed the third submittel descrit:ed the feedter.L arrangerer,ts which ensurt that the licensee receivts all tre technical trifornattori ssnt out by their i:5SS vendor.
l 3.000pCLUS10N j
besee on our revier cf these responses, the staff finds that the licensee's stotteents confirr.. that a ver d.r inte rface progrec. exists with the I:SSS ver.dcr for cceronents thtt ere ter;uired fer pvrforter.ct of the reactor trip fur.ction.
l This progrer; seets the rr,quirerents of Item 2.1 (Part 2) of Generic Letter
[
E3 26, and is, thereforse, acceptable.
f 4.0,R,Ef,ERE NC ES 1.
P FC Letter, D. C. Ciserbut to ell Licensee of Operating Feacturs, Arplicents for Cp'eratirg Lictoses, and Folders of Construction Perrits, "Required Actions Eased on Generic f rplications of Saleni ATWS Events (Ger.tric Letter E3 PS)," July 8, ISt5.
2.
Letter, J. E. Fooker, Gulf States Utilities Company to D. C. Eisenhut, i:FC, llovember 1,1903.
j 3.
Letter, J. E. Ecover, Gulf States Utilities Company to D. G. Eisenhut, NRC, August 3, 1984 l
r 4.
Letter, J. E. Booker, Gulf States Utilities Company to D. G. Eisenhut, NRC, August 11, 1988.