ML20195K410
| ML20195K410 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/30/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-88-21, TXX-88795, NUDOCS 8812050205 | |
| Download: ML20195K410 (1) | |
Text
a MFE Log # TXX-88795 File # 10110
=
=
903.9 N/ ELECTRIC Ref. # 10CFR50.55(e) s November 30, 1988
$$ESdN,u U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSTRUMENT TUBING CLAMPS SDAR: CP-88-21 (SUPPLEMENTAL REPORT)
Gentlemen:
On January 29, 1988, TV Electric letter logged TXX-88140 notified the NRC of a deficiency involving J. C. White tube clamps.
The last report on this issue, logged TXX-88621, was submitted August 10, 1988.
The purpose of this letter is to revise the corrective action implementation schedule for this issue.
The estimated completion date for implementation of the Unit 1 corrective acticns (stated in TX.v.88140) has been revised to June 28, 1989.
The Unit 2 scheduled completion desa has not changed.
Very truly yours, 0]l0C i
W. G. Counsil HAM /gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
$k 8S12050205 881130
{DR ADOCK 0500044$
do l
PDC 400 Nonk Obw Suret LB81 Dallas, Texss 73.41
-