ML20195J880

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1988 for Millstone Unit 2 & Revised Unit Shutdown & Power Reductions Sheet for Apr 1988
ML20195J880
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/09/1988
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20155D855 List:
References
MP-11929, NUDOCS 8806290270
Download: ML20195J880 (1)


Text

lT General Offices

. cmcwe w mo w cc==ac wri mw u, nuc ac ccww.

P.O. BOX 270

            • '""*C***'

H ARTFORD. CONNECTICUT 06141-0270 C'.$iU.$,'c7.,,

(203) 665-5000 I

k L

J June 9, 1988 MP-11929 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 88-05 in accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed.

Also attached is a revision for the April 1988 Unit Shutdown and Power Reductions sheet.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

,/

j< kn, t'a cC-Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GN: f aj cc:

W.T.

Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3

[

)

R rB 2-4

'h

,