Forwards Update to Module 23 of Facility Readiness Review Program.Encl Withheld (Ref 10CFR73.21 & 2.790)
ML20195J691
Person / Time
Site: Vogtle 
Issue date: 11/23/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1512, NUDOCS 8812050009
Download: ML20195J691 (2)


Text

-__

Georgia Power Company I'

Post Off co Box 282 Waynesboro. Georg a 3083o Telephone 404 554 9961. Extension 3413 404 724 8114. Enters;on 3413 N

Georgia Power P. D. Mc.

Vfe P s e November 23, 1998

,,m o, m.c s,s..g United States Nuclear Regulatory Comission ATTN: Document Control Desk File:

X780102 Washington, D. C.

20555 Log:

GN-1512

Reference:

Vogtle Electric Generatlng Plant - Unit 2 Readiness Review Program An update to Module 23 of the Vogtle Unit 2 Readiness Review Program, l

entitled Plant Security, is enclosed for review and acceptance by the Nuclear Regulatory Comission (NRC).

This update is to be inserted into your copy of the module as directed by the enclosed Revision Insertion i

l Instructions.

This update contains yellow pages denoting the following report revisions:

l

1) Revision 2 to Phase 1.

This revision reflects editorial changes, changes in the Project's comitments through Amendment 10 of the Physical Security Plan, and I

prJject status changes.

2) The Phase 3 evaluation.

Phase 3 consists of a security test program implementation assessment, en assessment of th? transition program, a sptem walkdown, a phase 1 comitment implementation update, and fo11cWr on phase 1 and phase 2 corrective actions.

Phase 3 is the f e sse of a three-phase review of tne plant security system Ea i.c.

.e review detailed in this module, I am of the opinion that, w: 6 impl.

tion of corrective actions to the findings identified, the plant securii system is proceeding in conformance with licensing comitments.

The information herein is, to the best of my knowledge, factual and technically correct.

This submitti, ccmtains no proprietary information and may be placed in the NRC Public Occument Room, i

mm.unico l

di,Q SAMouAfes Ngpew y

u

,cM 2A

~ ~ m eg l

MGE e naenwrpnin an 881205000v W1123 s

FDR ADOCK 05000425 F

PDC

~

(

6

'E GN-1512 Page 2 The information contained in the enclosure is safeg r as information and, in accordance with 10 CFR 7C.21 and 10 CFR 2.790, shou!d not be placed in the NRC Public Document Room.

P. D. Rice RWM/POR/bjb Enclosure xc:

Ceyer lettet:

Module Distribution:

M. L. Ernst M. V. Sinkule (3)

R. P. Correia J. B. Hopkins H. G. Baker, Jr.

C. W. Burger D. R. Altman J. E. Swartzwelder D. H. Smith, (OPC)

F. R. Timons J. E. Joiner, (TSLA)

G. R. Frtderick P. R. Mcdonald R. W. McManus (2)

P. D. Rice D. E. Dutton R. A. Thomas J. A. Bailey R. H. Pinson W. C. Ramsey D. T. King G. Bockhold, Jr.

H. M. Handfinger E. D. Groover Document Control RR File WJ 00UM CONRMS 0090v/327-8

" NSE UPCH 867.WW10N DW j

%"2 B N ian

,