Final Deficiency Rept CP-87-29 Re Instrumentation & Controls Used for Isolation of Component Cooling Water to Reactor Coolant Pump Thermal Barrier Hx.Initially Reported on 871211.Mods Will Be Evaluated Using Design Basis Criteria
ML20195J211
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/18/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-29, TXX-88107, NUDOCS 8801260479
Download: ML20195J211 (2)


Text

.

.e

,.. w.

r 1

MFE Log. # TXX-88107 r

File # 10110

__r

=

909.2

# IU" U'

('

1UELECTRIC I,*,',0Sd%"$,,,

January 18, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAX STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 COMP 0NENT COOLING WATER (CCW) ISOLATION FOLLOWING REACTOR COOLANT PUMP (RCP) THERMAL BARRIER RUPTURE SDAR:

CP-87-29 (FINAL REPORT)

Gentlemen:

On December 11, 1987, we notified you via our interim report logged TXX-7081 of a reportable item involving instrumentation and controls used for isolation l

of component cooling water (CCW) to the reactor coolant pump (RCP) thermal i

barrier heat exchanger.

This is a final report submitted to provide additional information describing the cause of the deficiency and corrective actions of a reportable item under the provisions of 10CFR50.55(e).

The cause of the deficiency appears to have been a design error on the part of the original design organization.

Due to the unique operational requirements and alping arrangement of CCW to the RCPs, we consider this deficiency limited to t1is installation.

Design Change Authorizations (DCAs) 56897 and 60984 have been initiated to implement the corrective action specified in our last report.

The criteria for detection and isolation of the rupture of a thermal barrier is provided in Design Basis Document, DBD-ME-229, entitled."Component Cooling Water System."

In addition, DBD-ME-028, "Classification of Structures, Systems, and Components," has been issued to provide criteria related to this issue.

In order to prevent the recurrence of this condition, further plant modifications shall be evaluated using this DBD criteria to ensure conformance to CPSES design commitments.

l l

l l

8801260479 880118 9

PDR ADOCK 05000445 T

3 l

DCD 1

il0 400 North Olive Street LB8i Dallas Texas ?$201

TXX-88107 January 18, 1988 Page 2 of 2 The prescribed corrective actions are currently scheduled for completion by January 13, 1989.

Records will be available for your inspectors review af ter that date.

Very truly yours, i