Requests Commission Review & Approval of Facility Integrated Leak Rate Test Schedule,Per 10CFR50,App J,Paragraph III.A.6(a) & Unit Tech Specs.Next Test Planned During Third Refueling Outage for Fall 1990
ML20195H461
Person / Time
Site: Limerick Constellation icon.png
Issue date: 06/20/1988
From: Fogarty E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Russell W
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8806280298
Download: ML20195H461 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l PHILADELPHIA El.ECTRIC COMPANY I

2301 MARKET STREET l

P.O. BOX 8699 PHILADELPHIA, PA 19101 (as s) e41.sozo 10 CPR Part 50

,,,,,7y nuet a

".u%.'r" omeion Appendix J June 20, 1988 Docket Nos. 50-352 Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Unit 1 lategrated Leak Rate Test (ILRT) Schedule

Dear Mr. Russell:

The purpose of this letter is to request Commission review and approval of the Limerick Generating Station, Integrated Leak Rate Test (ILRT) schedule in accordance with Limerick Technical Specifications and 10 CFR 50, Appendix J, paragraph III.A.6(a).

Limerick Technical Specification 4.6.1.2(b) states: "If any periodic Type A test fails to meet 0.75La, the test schedule for subsequent Type A tests shall be reviewed and approved by the Commission...".

During the Unit 1 First Refuel Outage a containment ILRT failed to meet 0.75La.

The containment penetrations that caused the ILRT limits to be exceeded during the last integrated leak rate test have been identified and will be tested during future local leak rate tests.

These penetration leskage rates can be monitored and controlled and therefore, will pose no threat to containment integrity.

A complete local leak rate testing (Type C testing)

{

program will be performed during the Second Refuel Outage, scheduled u

for January 1989.

The next ILRT (Type A test) is planned for the Unit I

1 Third Refuel Outage currently scheduled for the Fall of 1990.

If you have any questions or require additional information, please do not hesitate to contact us.