Requests Extension in Reporting Results of Fastener Testing Required by NRC Compliance Bulletin 87-002 Until 880215
ML20195H403
Person / Time
Site: Beaver Valley
Issue date: 01/12/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-87-002, IEB-87-2, NUDOCS 8801190298
Download: ML20195H403 (1)


Text

v

~

den

'Af M

Tei.p%n. om 3934w N$Yx!

  • smpensport. PA 15077mo4 January 12, 1988 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1-and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412,-License No. NPF-73 Gentlemen:

1' The purpose of this letter is to request an extension in reporting the results of fastener testing required by NRC Compliance Bulletin 87-02 "Fastener Testing to Determine Conformance with Applicable Material Specifications".

The required sample of fasteners has been selected and sent to a

vendor for chemical, mechanical' and hardness testing as specified in the Bulletin.

However, we have not received the results of the testing from the vendor as of this time.

Therefore,-we request an extension until

-February 15, 1988 for submitting the results of fastener testing and other information as requested by the Bulletin.

If you have any questions concerning this matter, please contact my office.

Very truly yours, i

d D.

er Vice President, Nuclear cc:

Mr.

J. Beall, Sr. Resident Inspector Mr. W.

T. Russell, NRC Region I Administrator i

Mr.

P. Tam, Project Manager Director, Safety Evaluation & Control (VEPCO) et t

g 4/

dE

'D 880119029880112' B

l PDR ADOCK 05000334 i

0 DCD

-. - - - -