ML20195H224
| ML20195H224 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 12/31/1987 |
| From: | Haltiwanger J, Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Barry L NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8801190130 | |
| Download: ML20195H224 (5) | |
Text
_ _ _ _ _ _
. ~. ',
1 Document Control Desk December Monthly 0perating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL SOCKET NO.
50/395 UNIT V. C. SUMMER'I DATE 01/04/88 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 OECEMBER 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
889 17.
892 2.
890 18.
890 3.
890 19.
892 4.
890 20.
892 5.
878 21.
891 6.
890 22.
891 7.
890 23.
892 8.
890 24.
892 9.
891 25.
892 10.
891 26.
893 11.
891 27.
892 12.
891 28.
890 13.
891 29.
890 14.
891 30.
890 15.
891 31.
890 16.
891 563H 8801190130 871231
{DR ADOCK0500gg5
4 Document Control Desk December Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 01/04/88 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345 4297 OPERATING STATUS
- 1. Reporting Period:
December 1987 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900
- 3. Power Level to Which Restricted (If Any)(MWe_ Net):
N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 744.0 6.222.4 26,668.9
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 744.0 6,136.9 26.128.1
- 8. Unit Reserve Shutdown-Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,061,914 16,389,360 68,783,680
- 10. Gross Electrical Energy (MWH) 689,770 5,419,990 22,829,449
- 11. Net Electrical Energy Generated (MWH) 662,495 5,151,897 21,735,174
- 12. Peactor Service Factor 100.0 71.0 76.1
- 13. Reactor Availability Factor 100.0 71.0 76.1
- 14. Unit Service Factor 100.0 70.1 74.5
- 15. Unit Availability Factor 100.0 70.1 74.5
- 16. Unit Capacity Factor (Using MDC) 100.6 66.5 70.0
- 17. Unit Capacity Factor (Design MWe) 98.9 65.3 68.9
- 18. Unit Forced Outage Rate 0.0 5.4 6.5
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
None
- 20. If Shut Down at End of Report Period Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
il/A
1 Document Control Desk December Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET N0.
50/395 UNIT V. C. SUMMER I DATE 01/04/88 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 DECEMBER 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power NONE 1
[.-
i
' Document Control Desk December Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE v
DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 01/04/88 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 r
DECEMBER 1987 V. C. Summer Nuclear. Station, Unit 1, operated at approximately 100 percent power for the entire month of December 1987.
i k
t I
i l
i
.e s
na Electric & Gas Company Da A.
n Columbia. SC 29218 Nuclear Operations (803) 748-3513 10Cr ri50.30 SCE&G serm m January 13, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTN: Mr. Learned W. Barry
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 December Monthly Operating Report Gentlemen:
Please find enclosed the December 1987 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
y tru your ',"
6%WWw Q
A. Nauman AMM:JWH: DAN /bjh Ai.tachments pc:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
K. E. Noaland E. C. Roberts J. C. Snelson
- 0. S. Bradham G. O. Percival
- 0. R. Moore R. L. Prevatte W. A. Williams, Jr.
J. B. Knotts, Jr.
T. E. Murley INPO Records Center J. Nelson Grace ANI Library Group Managers L. N. Carter W. R. Baehr R. E. Rainear C. A. Price Marsh & McLennan R. B. Clary RTS W. R. Higgins NPCF C. L. Ligon (NSRC)
File R. M. Campbell, Jr.
g/
8 U