MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
.. l BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT C0letONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 (0625M/0062M-2) 8801190070 871231 PDR ADOCK 05000454 n en w 1. [ 2 4, j,'
. I. Monthly Report for Byron Unit 1 for the month of December 1987 A. Sumary of_ Operating Experience for Unit 1 The unit began this reporting period in Mode 1 at 98% power. On 12/19/87, at 0745, power was reduced to 37% to add oil to the 1A reactor coolant pump. By 12/21/87 power was returned to 98%. The unit operated at power levels of up to 98% for the rest of the reporting period.
(062SM/0062M-3)
e
'B. OPERATING DATA REPORT
'. DOCKET NO.: 050-454 UNIT: Byron On3
. DATE: 01/10/88 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: December 1987. Gross Hours: 744
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED
- 3. Power Level to Which Restricted (If Any): 1097 (Mwe-net)
- 4. Reasons for Restriction (If Any): Steam Generator Split Flow (23MW)
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 8760 20089
- 6. Rx Critical Hours' 744 6210 15312
- 7. Rx Reserve Shutdown Hours 0 0 37.8
- 8. Hours Generator on Line 744 6007 14961
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 2307217 17050016.6 43595850.6
- 11. Gross Elec. Energy (MWH) 767956 5701545 14625777
- 12. Not Elec. Energy (MWH) 726878 5321399 13739477
- 13. Reactor Service Factor 100 70.9 76.2
- 14. Reactor Availability Factor 100 70.9 76.2
- 15. Unit Service Factor 100 68.6 74.5
- 16. Unit Availability Factor 100 68.6 74.5
- 17. Unit Capacity Factor (MDC net) N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 87.2 54.2 61.1
- 19. Unit Forced Outage Hrs. 0 135.1 912.1
- 20. Unit Forced Outage Rate 0 2.2 5.7
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): None I
- Note - The cumulative numbers do not reflect power generated prior to commercial se rvice.
l
! (0625M/0062M-4) i
t W - - ~ - - - - - - - - - - - - - - - - - - - ,- _ _ _ . _
8 C. AVERACE DAILY UNIT POWER' LEVEL DOCKET NO.: 050-454-UNIT: Byron One DATE: 01/10/88 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 MONTH: December,1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 1056 MW 16, 977 MW
- 2. 1072 MW 17.- 1044 MW
- 3. 1069 MW 18. 1025 MW i 4. 1070 MW 19. 447 MW
- 5. 1064 W 20. 521 MW 6, 999 MW 21. 851 MW
- 7. 1058 W 22. 1047 MW
- 8. 1056 W 23. 1026 MW
- 9. 1014 W 24. 985 MW
- 10. 1061 W 25. 981 MW
- 11. 1054 W 26. 1053 MW
! 12. 1046 W 27. 1065 MW
't
- 13. 898 W 28, 1064 MM
- 14. 889 W 29. 976 MW
- 15. 835 MW 30. 1048 MW
- 31. 1021 MW INSTRUCTIONS
' On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will ba used to plot a graph for each reporting month. Note that when maximum dependable capacity is ussd for the not electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-5)
cosecoccoococoococcooooo
~
0 O R; port P2riod December, 1987 UNIT SHUTDOWNS / REDUCTIONS BYRON ,
(UNIT 1) **********************o**o No. Date Type Hours Reason Method LER Number System Famnarnent Cause & Corrective Action to Prevent Recurrence
- 9. 12/18/87 N/A -
A 5 Ramped down to add oil to RCP.
ocoe ..........
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-OlCl)
(0625M/0062M-6)
~1
E. UNIQUE REPORTING REQUIREMENTS (UNIT 1) for th7 month of Dicember 1987
- 1. Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None
- 2. Licensee generated charges to ODCM. (Y/N)
No
- 3. Indications of failed fuel. (Y/N) ,
Yes. 1131 = 2.0 E-3 pcuries/ gram T
L I
I I
I' i
b (0625M/0062M-7)
[
I
'F. LICENSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, December 1 through December 31, 1987. This information is provided pursuant ;
to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence -
Licensee Event Report Number Date Title of Occurrence None a
I i
4
)
F b
- t r
1 i
2 -
1 l
l t
i l
l l t
'l l l
I i (0625M/0062M-8) l i l
j l.
l l .
. - - ,,, . _ . , - - - - , . _ -. , - , , , - . . . - . . , . , ~ . , , , , - . , - . - . . -,
u .
II. Monthly Report for Byron Unit 2 for the month of December 1987 l
A. Surrunary of Operating Experience for Unit 2 The unit began this reporting period in Mode 5 (Cold Shutdown).
Mode 4 (Hot Shutdown) was entered at 1305 on 12/15/87. On 12/19/87 at 1658 Mode 3 (Hot Standby) was entered. The reactor was taken critical at 1354 on 12/21/87. The unit was synchronized to the grid at 0233 on 12/22/87. The unit operated at power levels of up to 88%
until 12/30/87 when a power reduction to 28% was begun because of steam generator chemistry concerns. The unit operated at approximately 28% for the rest of the reporting period.
, /'
/
(0625M/0062M-9)
'D. OPERATING DATA REPORT
'. DOCKET NO.: 050-455 UNIT: Byrcn Two DATE: 01/10/88 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: December 1987. Gross Hours: 744
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED
- 3. Power Level to Which Restricted (If Any): 1055 (MWe-net)
- 4. Reasons for Restriction (If Any): Steam Generator Split Flow. (65 MW)
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 3193 3193
- 6. Rx Critical Hours 250.1 2329.2 2329.2 Rx Reserve Shutdown Bours 0 0 0 7.
- 8. Hours Generator on Line 237.4 2280.4 2280.4
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 347977 6472163.4 6472103.4
- 11. Gross Elec. Energy (MWH) 108548 2104311 2104311
- 12. Net Elec. Energy (MWH) 91060 1970901 1970901
- 13. Reactor Service Factor 33.6 72.9 72.9
- 14. Reactor Availability Factor 33.6 72.9 72.9
- 15. Unit Service Factor 31.9 71.4 71.4
- 16. Unit Availability Factor 31.9 71.4 71.4
- 17. Unit Capacity Factor (MDC net) N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 10.9 55.1 55.1
- 19. Unit Forced Outage Hrs. 0 288 288
- 20. Unit Forced Outage Rate 0 11.2 11.2
- 21. Shotdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated D2te of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M-10)
'C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-455
, UNIT: Byron Two DATE: 01/10/88 COMPILED BY: D. J. Spit::er TELEPHONE: (8151234-5441 x2023 ,
i MONTH: December, 1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. O MW 16. O MW
- 2. O MW 17. O MW
- 3. O MW 18. O MW
- 4. O MW 19. O MW
- 5. O MW 20. O MW
- 6. O MW 21. O MW
- 7. O MW 22. 206 MW 0 MW 23. 277 MW
- 9. O MW 24, 230 MW F
- 10. O MW 25, 343 MW
- 11. O MW 26, 340 MW
- 12. O MW _
- 27. 570 MW ,
- 13. O MW ?d. 667 MW
- 14. O MW 29, 901 MW i
- 15. O MW 30. 317 MW t
31, 248 MW ___
f INSTRUCTIONS i
On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or ;
the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-11)
ce*accoscucococccooococco Report Period December,1987 UNIT SHUTDOMES/REDUCTICBIS 0 BYRON o "
(UNIT 2) ocococococcococcocococcoco No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence
- 7. 12/22/87 S 506.5 H 4 Unit 2 Surveillance Outage Ends.
- 8. 12/30/87 F 48 H 5 Steam Generator Cation Conductivity ecocee***eeeeee
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report l
& License Examination 9-Other (LER) File (.WREG-0161)
(0625M/0062M-12)
'.E . UNIQUE REPORTING REQUIRDENTS (UNIT 2) fer the month cf Decimber 1987
- 1. Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PIANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None
- 2. Licensee generated changes to ODCM. (Y/N)
No
- 3. Indications of failed fuel. (Y/N)
Yes. I131 = 2.0E-2 pcuries/ gram (0625M/0062M-13)
0
_F . LICENSEE EVENT REPORTS (UNIT 2)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, submitted during the reporting period, ,
December 1 through December 31, 1987. This information is provided pursuant _l to the reportable occurrence reporting requirements as set forth in 10CFR l' 50.73.
Occurrence Licensee Event Repcrt Number Date Title of Occurrence 87-020-00 12/02/87 Unanticipated Water Discharge Into the RCS From the Safety Injection Accumulators Due to a Procedural Inadequacy P
t P
(0625M/0062M-14)
, ~ r, January 10, 1988 LTR: BYRON 88-0011 File: 2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Comnisalon Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byrc.t Nuclear Power Station for the period December 1 through December 31, 1987.
Very truly yours, R. E. Querio Station Manager Byron Nuclear Power Station REQ /IA75/bb cc: A.B. Davis, NRC, Region III NBC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety T.J. Maiman/K.L. Graesser L.D. Butterfield Nuclear Fuel Services, PWR Plant Support
- L. Anastasia, Station Nuclear Engineering INPO Records Center 4
L. Olshan - USNRC (0625M/0062M-1)