ML20195G588
| ML20195G588 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/23/1988 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CON-NRC-88-059, CON-NRC-88-59 VPNPD-88-327, NUDOCS 8806280061 | |
| Download: ML20195G588 (2) | |
Text
,,
o
/
Wisconsin Electnc POWER COMPANY 231 W M>choon, PO. Box 2046. MAoAee. Wi 53201 (414)221 2345 VPNPD-88-327 10 CFR 50.54 NRC-88-059 June 23, 1988 U.
S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.
C.
20555 Gentlemen:
DOCKETS 50-266 AND 50-301 CORRECTION OF ERRATUM TO QUALITY ASSURANCE PROGRAM DESCRIPTION CHANGES POINT BEACH NUCLEAR PLANT In accordance with the requirements of 10 CFR 50.54(a)(3),
Wisconsin Electric Power Company has previously submitted the latest revisions to Section 1.8 of the Final Safety Analysis Report (FSAR) for Point Beach Nuclear Plant in transmittal VPNPD-88-321/NRC-88-054 dated June 13, 1988.
This follow-up transmittal provides a revised version of Figure 1.8-1, "Wisconsin Electric Power Company organizations with Quality Assurance Interface to Point Beach Nuclear plant."
The previously submitted chart did not reflect an organizational change that took effect in August 1987.
The position of Superintendent - Security & Fire Protection has been replaced by two positions:
System Fire Protection Officer and Corporate Security Officer.
Both positions ultimately report to the Executive Vice President.
Please replace the previous Figurn 1.8-1 with the attached revised Eigure 1.8-1.
We apologize for any inconvenience this may have caused.
If you have any questions in regard to the change described above and shown on the attached sheet, please contact us.
Very trul
- yours,
(, /
/
L/V l
C. W.
y Vice President 0f Nuclear Power 0
Attachment f
\\
Copies to NRC Resident Inspector i
NRC Regional Administrator, Region III 8806280061 800623 i
ADOCK0500'g6 DR y v gm,g
6 e
OFFICE OF THE ORHMAN
(
f
)
)
PRESIDENT QA COM M EXECUTn.T.
MCE PGtRDENT
(
(
)
)
SEMOR VICE PRESIDENT r
(
)
)
l VCE PRE'SIDENT MCE PRE 51 DENT MCE PRESIDENT cot UCT10 4 DEPT.
D 4T (See Figure 1.8-2)
DTPECTOR DIRECTOR IT STORES D T SUPERNTDJDENT CORPORATE Sg g LAB R CES PROTECTION OFFICER pp)
Figure 1.8-1 WlSCONSIN ELECTRIC POWER COMPANY ORGANIZATIONS WITH QUAUTY ASSURANCE INTERFACE TO POINT BEACH NUCLEAR PLANT Revision 4 dme 1988
-