ML20195G336

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted
ML20195G336
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/16/1998
From: James Gavula
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20195G339 List:
References
50-341-98-17, NUDOCS 9811200266
Download: ML20195G336 (2)


See also: IR 05000341/1998017

Text

.-.

-

--

-

-

-

..

-.

-

.

.

..

.

November 16, 1998

.

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

i

SUBJECT:

NRC INSPECTION REPORT NO. 50-341/98017(DRS)

Dear Mr. Gipson:

On October 21,1998, the NRC completed an inspection at your Fermi 2 Nuclear Power Station.

The results of the inspection were discussed with Mr. Paul Fessler and other members of your

staff on October 21,1998. The enclosed report presents the results of this inspection.

The purpose of the inspection was to review the implementation of the inservice inspection

program for the Fermi 2 refueling outage 6. In addition, this inspection also reviewed activities

associated with your installation of the emergency core cooling system suction strainers and the

,

drywell drain sump discharge piping overpressure protection modification.

We concluded that, overall, the inservice inspection program was implemented in an effective

l

manner. The emergency core cooling system suction strainer, and the drywell drain sump

l

discharge piping over pressure protection modifications had excellent pre-job planning and were

i

property performed and controlled. The inspection consisted of a selective examination of

procedures and representative records, interviews with personnel, and observations of activities

in progress.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have conceming these inspections.

Sincerely,

Original /s/ J. A. Gavula

,

,

f

!

9811200266 991116

ADOCK 050003 1

gDR

James A. Gavula, Chief

Engineering Specialists Branch 1

i

Docket No.: 50-341

)

License No.: NPF-43

l

Enclosure: Inspection Report 50-341/98017(DRS)

See Attached Distribution

,

DOCUMENT NAME: G:\\DRS\\FER98017 wpd

To receive a copy of this document. Indicata in the boa: "C's Copy withcnd ab.;-.,..khe

"E' = Copy eth aw c c.L .;v.ure v = No copy

OFFICE

Rlll

E Rlil

aj p,, - fE Rill

, , . , l 6-

_

NAME

Jones:sd@

Swgefs V8GE L

Gavula)f[4{

,

DATE

11/5 /98

11//3/98

11//t /9M V

"

OFFICIAL RECORD COPY

l

..

l

.-

Gipson

-2-

cc w/ encl:

N. Peterson, Director, Nuclear Licensing

P. Marquardt, Corporate Legal Department

R. Gaston, Compliance Supervisor

R. Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Monroe County, Emergency Management Division

Emergency Management Division, Ml Department

of State Police

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enci

B. Clayton, Rlli w/ encl

- SRI Fermi w/ enc!

DRP w/ encl

TSS w/enci

DRS (2) w/enct

Rill PRR w/enci

PUBLIC IE-01.wlenci

,m

  • Docket Fildw/enct

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

1

1

l

1

/) (i :$

("- S

'

Ge () *) %$ % N

.

J