Submits Status of Unit 1 Restart Work Required by NRC to Be Completed in Order to Begin Single Sys Quality Evaluation Insp,Per NRC
ML20195G301
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/17/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806270292
Download: ML20195G301 (2)


Text

,

b TENNESSEE VALLEY AUTHCRITY

"" ^"iffBY#oMWfau" 5N JUN 171988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tannessee Valicy Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) UNIT 1 - SYSTEM QUALITY EVALUATION INSPECT

References:

1.

NRC letter to S. A. White dated May 20, 1988, "System Quality Evaluation Inspection" 2.

TVA letter to NRC dated March 31, 1988, "Sequoyah Nuclear Plant (SQN) - Unit 1 Restart Plan" In accordance with reference 1, the following is the status of the Unit I restart work required by the NRC to be completed in order to begin the single system quality evaluation (SSQE) inspection.

1.

All phase 1 walkdowns are required to be complete.

The Design Baseline and Verification Program (DBVP) phase I walkdowns have been completed.

2.

The review by Engineering Assurance is required to be complete.

The Engineering Assurance review of DBVP phase 1 has been completed, and all items requiring corrective action have been identified.

3.

An average of 75 percent of the work to be completed before unit I restart is required to be complete.

The progress made on the work required for restart of unit I will support the SSQE inspection.

This conclusion is based on an assessment of the status of the areas in reference 2 requiring fleidwork by the project manager of each Although not directly quantifiable, TVA estimates that an area.

average of 75-percent or greater completion has been achieved.

This was discussed with the NRC staff on May 25, 1988, and May 27, 1988.

Based on the status of unit I restart work with respect to the three requirenients, TVA is ready for the SSQE inspection to begin.

If you have any questions, please telephone M. R. Harding at (615) 870-6422.

Very truly yours, 8806270292 080617 PDR ADOCK 05000327 O

PDRJ R.G.ldleh, Dire pOY or Nuclear Licensing and Regulatory Affairs J

j g

i cc: See page 2 An Equal opportunity Employer

- 4 *.

.... U.S. Nuclear Regulatory Commission JUN 171988 cc: Mr. K. P. Barr, Acting Assistant Director for Inspection Programs l

TVA Projects Division U.S. Nuclear Regulatory Commissier, Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Ms. S. C. Black, Assistant Director for Projects TVA Projects Division l.

U.S. Nuclear Regulatory Commission l

One 14hite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 1

i l

1

_- --_- - - - _--__-____--____-_. -_--_--