ML20195G249

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for May 1988 for Hatch Units 1 & 2 & Revised Monthly Operating Repts for Apr 1988. Revised Repts Reflect Reclassification of Unit 1 Event 88-005 & Unit 2 Event 88-005 to Account for Shutdown
ML20195G249
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/15/1988
From: Mcdonald R
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20195C042 List:
References
SL-4774, NUDOCS 8806270271
Download: ML20195G249 (2)


Text

_ _ _

.Ge:qe ibnet Cvwxrt 3M Pedrmt Avev Ava. Georg<a sob 3 Te'e;Nre 404 526 6 % 6

v. wm Fre* OM ca f6 4545 AJdi Georg i 30302 R. P. VcDonald t*e so#c'n.Rxttc symm E erut w '/.ce Prescem NJ \\ at Op.nbho%

SL-4774 5

0314I X7GJ17-H510 June 15, 1988 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C.

20555 t

s PLANT HATCH - UNITS 1, 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:

Submitted herein a3 Enclosures 1 and 2 are the Monthly Operating Reports for Hay, 1988 for Plant Hatch Unit 1. Docket Number 50-321, and for Plant Hatch Unit 2,

Docket Number 50-366.

These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10.

Revisions to the Monthly Operating Reports for April, 1988 are included as Enclosures 3 and 4.

The revised reports reflect the reclassification of Unit 1 Event No.88-005 and Unit 2 Event No.88-005 4

to account for the management directed shutdown.

Revisions to the April, 1988 reports are denoted by vertical lines drawn in the margins.

The revised reports supercede the monthly operating report data provided by our letter SL-4671 dated May 13,1988.

Sincerely, b

9 R. P. Mcdonald CLT/ct

Enclosures:

1.

Monthly Operating Report for Hatch-1 for Hay,1988 2.

Monthly Operating Report for Hatch-2 for Pay, 1988 3.

Revised Monthly Operating Report for Hatch-1 for April, 1988 4.

Revised Monthly Operating Report for Hatch-2 for April, 1988 c:

(see next page) d 8806270271 000615 PDR ADOCK 05000321 i\\

R PDR

s.

a 4

Georgia Power d Director, Office of Management and Program Analysis June 15, 1988 Page Two c: Gent.pla Power Comoany Mr. J. T. Beckham, Jr., Vice President - Plant Hatch Mr. L. T. Gucwa, Manager Nuclear Safety and Licensing GO-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. C.

Mr. L. P. Crocker, Hatch Licensing Project Manager U. S. Nuclear _8.egulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch l

i l

I 1

[

0314I l

L a