Requests Review of Licensee Response Re Item II.K.3.3. Re Reporting of Relief Valves & Safety Valves Failures & Challenges to Ensure Listed Commitment.Sample Ltr Encl May Be Used to Closeout TMI Action Plan Item
ML20195G134
Person / Time
Issue date: 02/25/1982
From: Colburn T
Office of Nuclear Reactor Regulation
To:
NRC
References
TASK-2.K.3.01, TASK-2.K.3.02, TASK-2.K.3.03, TASK-TM TAC-44128, TAC-45242, TAC-45243, TAC-45273, TAC-45288, TAC-45289, TAC-45319, TAC-45323, TAC-45333, TAC-45357, TAC-45376, NUDOCS 8705280503
Download: ML20195G134 (3)


Text

i 90 cec

(

g

, cd o

UNITED STATES i

y

(

g NUCLEAR REGULATORY COMMISSION pC WASHIP.GTON, D. C. 20555 w

y e

\\$...*'./"

FEB 2 51982 i

MEMORANDUM FOR:

All Operating Reactors Project Managers FROM:

Timothy G. Colburn, Project Manager, ORB #3

SUBJECT:

TMI ACTION PLAN II.K.3.3 REPORTING RV AND SV FAILURES AND CHALLENGES My recent guidance memorandum dated Febraury 1, 1982 stated that Technical Specifications formalizing the reporting of RV and SV failures'and challenges were required to close out this multiplant action item.

New guidance indicates that this issue may be closed out absent the issuance of Techni-cal Specifications, with the TS to be issued at a later date.

In order to close out this' issue for your licensee, you should review the licensee's response's regarding II.K.3.3 and ensure that they commit to the following:

(1) A report documenting relief valve and safety valves failures and challenges should be pro 0ided to the NRC for the period 4/l/80 through 12/31/80.

(2) a.

Future f ailures of relief valves or safety valves sho0ld be reported promptly to the NRC.

~

b.

Future challenges of relief valves or safety valves should be documented via periodic reports to the NRC e.g. annual report or monthly operating report.

If your licensee's responses commit to the above this item can be closed out.

A sample close out letter is provided as Enclosure 1.

If the licensee's responses do not commit to the above criteria you should send a letter requesting that they do so. A sanole letter is provided as Enclosure 2.

Please put me on concurrence and cistribution for either of the above letters.

'[.

,'2,

7'$

c>

Timothy G. Colburn, Project Manager Operating Reactors Branch F3, DL

Enclosures:

as stated

~

^

' X/$.86GW 3 ys n.

m

e i

as ucoq p

jo UNITED STATES e

t 4

g, NUCLEAR REGULATORY COMMISSION y

g(';g g4 E

WASHINGTON, D. C. 20555 Docketflo(s).

Utility Address Dear Mr.

RE: TMI Action Plan Item II.K.3.3, Reporting Relief Valve and Safety Valve Failures and Challenges We have reviewed your response (s) dated to the above TMI.

Action Plan item.

You have committed to meeting the reporting requirements provided in our previous guid'ance including a report on relief valve (RV) and safety valve (SV) failures and challenges for the period 4/1/80 through 12/31/80 and future reporting of RV and SV failures and challenges. No further revisw of this item by NRR is planned. Because you have committed to meeting the above reporting requirements, we consider this item resolved for your facilities.

However, we wish to formalize these reporting requirements; therefore, we will contact you in the future requesting that you administratively incor-porate the reporting requirements in your Technical Specifications.

Sincerely,

, Chief Operating Reactors Branch #

Division of Licensing cc:

See next page e

6

.)

8

'o UNITED STATES q

i NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D. C. 20555 5g

p k**e

,/

Docket No(s).

+

Utility Address Dear Mr.

RE: TMI Action Plan Item II.K.3.3, Reporting Relief Valve and Safety Valve Failures and Challenges.

We have reviewed your response (s) to the above TMI Action Plan Item dsted Your. response did not commit to meeting all of the reporting requirements for this issue.

Specifically,-

It is requested that you provide by letter ycur commitment to comply with the above reporting requiren:ents. Your response is requested within 30 days receipt of this letter.

It is planned that these reporting requirements will be formalized administratively in your plant's Technical Specifications.

We will contact you in the future regarding this.

This request for information was approved by the Office of Management and Budget under clearance number 3150-0065 whicn' expires May 31, 1983.

Sincerely,

, Chief Operating Reactors Branch #

i Division of Licensing ec:

See next page