ML20195F955
| ML20195F955 | |
| Person / Time | |
|---|---|
| Site: | 05000083 |
| Issue date: | 11/14/1988 |
| From: | Vernetson W FLORIDA, UNIV. OF, GAINESVILLE, FL |
| To: | Ernst M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8811220455 | |
| Download: ML20195F955 (1) | |
Text
P.
4 NUCLEAR ENGINEERING SCIENCES DEPARTMENT e
Nuclear Reactor Facility University of Florida I
" ;vemeessa,onc+or kVCdAI DEACTot SULDike e
Goswvpe.Hertdo 3M11 r,
m m.un.s.sn usa November 14, 1988 U.S. Nuclear Regulatory Com:sission Suite 2900 c
s 101 Marietta Street, N.W.
Atlanta, CA 30323 Attention: Malcolm L. Ernst Acting Regional Mainistrator, Region II Re t University of Florida Training Reactor Facility License : R-56, Docket No.
50-83 As per telephone call of 14 November 1988, relative to perfor-mance of a reactor startup without performing a daily checkout or blade interlock check within the required time interval pursuant to UTTR SOP-A.2, "Reactor Startup," the F_tecutive Committee of the Reactor Safety Review Subcommittee (RSRS) has reviewed and concluded potential violation of Tech Specs, Section 6.3 pertain-ing to the requirement that the facility be operated in accord-ance with written procedures. The RSRS has instructed NRC notifi-cation as per Section 6.6.2 of the UFTR Tech Specs and approved restart following the performance of retraining on the applicable S0P section for reactor operators.
/
i b'
)
n
/
William'G. Vernetson Date Director of Nuclear Facilities WGV/ps 9911220455 001114 PDR ADOCK 05000003 A
PNU suso w m w n,a.u smew i0 m.