.,__e i
November 5, 1998
,a Mr. Lew W. Myers Vice President - Nuclear, Perry l
Centerior Service Company.
l P.O. Box 97, A200
' Perry, OH 44081 i
SUBJECT:
REQUEST FOR REDUCTION-IN-COMMITMENT IN THE QUALITY
- ASSURANCE PROGRAM TO REMOVE THE RADIOLOGICAL ASSESSOR
. POSITION - PERRY NUCLEAR POWER PLANT (TAC NO. MA3661)
Dear Mr. Myers:
By letter dated September 23,1998 (PY-CEl/NRR-2317L), pursuant to 10 CFR 50.54(a)(3),.
]
FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposalincludes an organization change in the Radiation i
Protection Program which includes the elimination of the Radiological Assessor position. The
. staff has reviewed the submittal in accordance with 50.54(a) and determined that the changes l
- are acceptable in that the quality assurance program continues to meet the requirements of
. Appendix B of 10 CFR Part 50.
~ The staffs safety evaluation is enclosed.
Sincerely, I
Original si Douglas V. Pickekned by: Project Manager L:
, Senior Project Directorate 111-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
\\
Distribution:
Docket No. 50-440 PUBLIC EAdensam BBoger
Enclosure:
as stated PDlli-2 r/f SRichards Docket File h
..cc: see next page SBlack GGrant, R3 j
L DOCUMENTNAME: G:\\ PERRY \\MA3361.LTR To receive a copy of this document, indicate in the box: "C" = Co' py without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE' PM:PDIII-3, E-LA:PDIII-3 7 BC:HOMB 0:PDIII-2 o
NAME DPick% d '
EBarnhillfjpf" SBlack*
SRichards5FrP i.
DATE 11/0798 11 4# 98 11/02/98 11/-f/98 11/ /98
- *See memo-from SBlack to RBellamy dated 11/02/98 0FFICIAL RECORD COPY I
b 98.11200057 981105 PDR ADOCK 05000440 P
PW j
+
November 5, 1998 l
Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 l
Perry, OH 44081 l
SUBJECT:
REQUEST FOR REDUCTION-IN-COMMITMENT IN THE QUALITY l
ASSURANCE PROGRAM TO REMOVE THE RADIOLOGICAL ASSESSOR j
POSITION - PERRY NUCLEAR POWER PLANT (TAC NO. MA3661)
Dear Mr. Myers:
By letter dated September 23,1998 (PY-CEl/NRR-2317L), pursuant to 10 CFR 50.54(a)(3),
FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposal includes an organization change in the Radiation Protection Program which includes the elimination of the Radiological Assessor position. The staff has reviewed the submittal in accordance with 50.54(a) and determined that the changes are acceptable in that the quality assurance program continues to meet the requirements of l
Appendix B of 10 CFR Part 50.
The staffs safety evaluation is enclosed.
l Sincerely, Original signed by:
Douglas V. Pickett, Senior Project Manager Project Directorate lil-2 Division of Reactor Projects Ill/lV l
Office of Nuclear Reactor Regulation Distribution:
Docket No. 50-440 PUBLIC EAdensam BBoger
Enclosure:
as stated PDlll-2 r/f SRichards Docket File cc: see next page SBlack GGrant, R3 DOCUMENT NAME: G:\\ PERRY \\MA3361.LTR Ta recolve a copy of this document, indicate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE PM:PDIII,-3, E.
LA:PDIII-3 7 BC:HOMB D:PDIII-2 l0 i
NAME DPiclCM '
EBarnhill6fpr-SBlack*
SRichards @
DATE 11/0798 11498 11/02/98 11/6/98 11/ /98 l
l
- See memo from SBlack to RBellamy dated 11/02/98 0FFICIAL RECORD COPY l
(
. ~ -.
o rtrug l
p k
UNITED STATES l.
g j
NUCLEAR REGULATORY COMMISSION J
t WASHINGTON, D.C. 2006H001
\\ POT $
O November 5, 1998 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company l
P.O. Box 97, A200 l
Perry, OH 44081 I
SUBJECT:
REQUEST FOR REDUCTION-IN-COMMITMENT IN THE QUALITY l
ASSURANCE PROGRAM TO REMOVE THE RADIOLOGICAL ASSESSOR POSITION - PERRY NUCLEAR POWER Pl. ANT (TAC NO. MA3661)
Dear Mr. Myers:
i By letter dated September 23,1998 (PY-CEl/NRR-2317L), pursuant to 10 CFR 50.54(a)(3),
FirstEnergy submitted proposed revisions to the quality assurance program for the Perry Nuclear Power Plant (PNPP). The proposalincludes an organization change in the Radiation Protection Program which includes the elimination of the Radiological Assessor position. The staff has reviewed the subn-ittal in accordance with 50.54(a) and determined that the changes are acceptable in that the quality assurance program continues to meet the requirements of Appendix B of 10 CFR Part 50.
The staffs safety evaluation is enclosed.
Sincerely,
~N ; -._ h V
Douglas V. Pickett, Senior Project Manager Project Directorate lll-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
as stated cc: see next page
{
l l
w i
l..
L. Myers Perry Nuclear Power Plant, Units 1 and 2 Centerior Service Company l
u cc:
Mary E. O'Reilly James R. Williams l
FirstEnergy - A290 Chief of Staff i
10 Center Road Ohio Emergency Management Agency Perry, OH 44081 2855 West Dublin Granville Road Columbus, OH 43235-7150 i
Resident inspector's Office l
U.S. Nuclear Regulatory Commission Mayor, Village of Perry l
P.O. Box 331 4203 Harper Street Perry, OH 44081-0331 Perry, OH.44081 Regional Administrator, Region lli Radiological Health Program
- U.S. Nuclear Regulatory Commission Ohio Department of Health 801 Warrenville Road P.O. Box 118
- Lisle, IL 60532-4531 Columbus, OH 43266-0118 Sue Hiatt Ohio Environmental Protection OCRE Interim Representative Agency 8275 Munson DERR-Compliance Unit Mentor, OH 44060 ATTN:' Mr. Zack A. Clayton P.O. Box 1049 1
t Henry L. Hegrat Columbus, OH 43266-0149 Regulatory Affairs Manager Cleveland Electric illuminating Co.
Chairman Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081
.FirstEnergy Corporation State of Ohio
. Michael Beiting Public Utilities Commission Associate General Counsel East Broad Street 76 S. Main Columbus, OH 43266-0573 Akron, OH 44308 William R. Kanda, Jr., Plant Manager Mayor, Village of North Perry Cleveland Electric illuminating Co.
- North Perry Village Hall Perry Nuclear Power Plant 4778 Lockwood Road P.O. Box 97, SB306 North Perry Village, OH 44081 Perry, OH 44081 Donna Owens, Director Ohio Department of Commerce
- Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009 L
y w
c.m.-:
- -.-