ML20195F233
| ML20195F233 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/15/1988 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20195F235 | List: |
| References | |
| NUDOCS 8806240251 | |
| Download: ML20195F233 (2) | |
Text
-
EMERGENCY CORE COOLING SYSTEMS REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.5 The refueling water storage tank (RWST) shall be OPERA 8tf with:
a.
A contained volume of between 364,500 and 400,000 of borated water.
l b.
A boron concentration of between 2,300 and 2,500 ppm, and c.
A minimum water temerature of 35'F.
APP LICAB I LITY: MO CES 1, 2, 3 and 4 ACTION:
With the refueling water storage ta.nk inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STAN(BY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.5 The RWST shall be demonstrated OPERABLE:
a.
At least once per 7 days by:
1.
Verifying the water level in the tank, and 2.
Verifying the boron concentration of the water.
b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temerature when the outside air tegerature is < 35'F.
l SALEM - UNIT 1 3/4 5-7 Amendment No. 83 8806240251 800615 PDR AEOCK 05000272 P
PDR j
. ~
3 l
EMERGENCY CORE COOLING SYSTEMS REFLE LING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.5 The refueling water storage tank (RWST) shall be OPERABLE with:
a.
A contained volume of between 364,500 and 400,000 of borated water.
(
b.
A boron concentration of between 2,300 at i 2,500 ppm, and l
c.
A minimum water temperature of 35'F.
APP LICAB I LITY: MOES 1, 2, 3 and 4.
ACTION:
l With the refueling water storage tank inoperable, restore the tank to OPERABLE i
status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANCBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTCOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4. 5.:5 The RWST shall be demonstrated OPERABLE:
a.
At least once per 7 days by:
1.
Verifying the water level in the tank, and 2.
Verifying the boron concentration of the water.
b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST tegerature when the outside air tegerature is < 35'F.
S A LIM - UNIT 2 3/4 5-9 Amendment No. 55