ML20195F035
| ML20195F035 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 11/10/1998 |
| From: | Reynolds S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 9811190183 | |
| Download: ML20195F035 (37) | |
Text
<
i i
e L
i-L l-
- Mr. Oliver D. Kingsley' i
. President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West til -
l 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
QUAD CITIES MANAGEMENT MEETING
SUMMARY
Dear Mr. Kingsley:
l The NRC staff met with Commonwealth Edison and Quad Cities Nuclear Power Station management on November 2,1998. This management meeting was held at the Quad Cities l-Station and was open to public observation. Enclosure i contains the associated meeting l
summary. Enclosure 2 contains the handout provided by Commonwealth Edison during the
. meeting.
l In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its i
enclosures will be placed in the NRC's Public Document Room.
Sincerely,
/s/ Steven'A. Reynolds Steven A. Reynolds, Deputy Director Division of Reactor Safety q
Docket Nos.:.50-254; 50-265 License Nos.: NPF-29; NPF-30
Enclosures:
1.
Meeting Summary y
2.
' Meeting Handout
'See Attached Distribution I
DOCUMENT NAME: G:\\ quad \\qua11028. sum To receive a copy of thee document. Indicate in tne boa "C" = Copy without attachment / enclosure 'E' - Copy with attachment / enclosure u = no es b
OFFICE Rlli -
lE Rlli lG Rlli
[A/
l NAME Lerch/mlAgd(n RingM Reynolds DATE 11/10/98 11/e/98 11/10/98
. OFFICIAL RECORD COPY 3
i r
9811190183 991110 PDR ADOCK 05000254 P
PDR A
O. Kingsley cc w/encis:
D. Helwig, Senior Vice President H. Stanley, PWR Vice President C. Crane, PWR Vice President R. Krich, F ulatory Services Manager D. Greene, ucensing Director DCD - Licensing J. Dimmette, Jr., Site Vice President W. Pearce, Quad Cities Stat'on Manager C. Peterson, Regulatory Affairs Manager R. Hubbard
' M. Aguilar, Assistant Attorney General State Liaison Officer Chairman, Illinois Commerce Commission W. Leech, Manager of Nuclear MidAmerican Energy Company Distribution:
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/ encl J. Caldwell, Rlli w/enci C. Pederson, Rill w/enci B. Clayton, Rill w/ encl SRI Quad Cities w/ enc!
DRP w/enci TSS w/enci DRS (2) w/enci Rlli PRR w/encV
']
PUBLIC IE 01 w/ encl Docket File w/enci GREENS LEO (E Mail)
DOCDESK (E-Mail)
)
\\
i 1(,).
Public Meeting Summary i
Management Meeting for Quad Cities Nuclear Power Station
-l l
November 2 Manaaement Meetina Summary:
This management meeting was conducted as a part of continuing periodic oversight of the performance of the Quad Cities Station. The meeting was originally scheduled for October 8,1998, but was postponed to November 2,1998, due to conflicting activities occurring at Quad Cities. The most recent public management meeting was held on August 13,1998, and was conducted in two parts, with the first part of the meeting focused on activities associated with 10 CFR Part 50, Appendix R, Fire Protection, and the second part focused on current ; eris nn' nce and those areas of concern identified prior to restart in May 1998. This Novembe, 2,1998, meeting touched on the same areas, but was primarily centered on recent plant performance, in particular, the focus areas included a discussion of the Unit 1 scram on September 30,1998, performance of the Unit 28 feedwater regulating valve, successes and challenges in plant material condition improvement and corrective action improvement, and the status of fire protection improvement activities. Commonwealth Edison (Comed) representatives described significant improvement efforts, but also acknowledged existing challenges. Comed provided a thorough discussion of each of the focus areas, except fire protection. The fire protection discussion was limited because a detailed working level meeting on Quad Cities fire protection has been scheduled for November 19,1998, at the NRC offices in Rockville, Maryland. NRC representatives questioned Comed on the specifics of each of the events and improvement areas.
The Ecensee presented information contained in the applicable handout in Enclosure 2 during the meetings.
1
. -.. - ~
-. -.... ~. - - - - -..
' Partial List of Attendees:
N8Q J. Caldwell, Acting Regional Administrator, Region ill (Rill)
J. Dyer, Deputy Regional Administrator, Region IV (R lli Regional Administrator Designate)
S. Reynolds, Deputy Director, Division of Reactor Safety (DRS), Rlli R. Pulsifer, Project Manager, Nuclear Reactor Regulation (NRR)
M. Ring, Chief, Branch 1, Division of Reactor Projects, Rlil C. Miller, Senior Resident inspector, Quad Cities
- K. Walton, Resident inspector, Quad Cities Commonwealth Edison O. Kingsley, President Nuclear Generation Group D Helwig, Senior Vice President C. Crane, BWR Vice President
. J. Dimmette, Site Vice-President, Quad Citics J. Benjamin, Nuclear Oversight Manager R. Krich, Vice President, Regulatory Services W. Pearce, Quad Cities Station Manager R. Svalesan, Deputy Operations Manager D. Wozniak, Site Engineering Manager K. Gladrosich, Site Nuclear' Oversight J. Garrity, Fire Protection Improvement Project Manager-4 2
Commonwealth Edison Management Meeting Handout i
I i
l t -
i -
l I
t t
l r
l l
l l
t b
i I
f
~
i comr:d 1
}
Quad Cities Nuclear Power Station l
i i
NRC REGION III MANAGEMENT MEETING l
i Cordova, IL
?
November 2,1998
)
I f
i i
- - --- ---- - -- J
AGENDA i
i i
Introduction Joel Dimmette Operations Bob Svaleson Material Condition Dave Wozniak i
i Corrective Actions Bill Pearce Appendix R John Garrity 1
Closing Remarks Joel Dimmette l
i
[
t t
2
I i
?
i l
t i
f i
i I
INTRODUCTION
\\
f JoelDimmette Site Vice President 1
I I
l l
t I
3 b
t
v l
i DOe M
4k Z
2o D
~%
M M
q
.o
~
4 M
g A
4
'4 g
\\
g gQ y
C
l Operations Accomplishments i
. Effective Performance During Recent Plant 1
Maneuvers and Transients i-
. Self/ Peer Checks by Control Room Operators
. Operators Rotated into Training Organization t
i
. Distraction Free Control Room j
i I
5
O i
Operations Challenges Operations Leadership Role Lower Standard Work From Others Long Standing Material Condition Deficiencies Human Performance OOS Configuration Control
~
Pre Evolution Briefings Inadequate Use of Operating Experience
(
l Thoroughness / Questioning An Example is Unit 1 SCRAM t
6
Unit 1 SCRAM Unit 1 Feedwater Transient Scram, September 30
~
Causes Inadequate Sensitivity to High Risk Activities Inadequate Preparation and Review of OOS Insufficient Review and Briefing Prior to Evolution Knowledge of Feed Water Level Control System Plant Responded Correctly Some Material Condition Issues Revealed 7
m b
Scram / Challenges Corrective Actions
. Knowledge of Feedwater System Control Training Conducted l
. Conduct of Sensitive and Critical Evolutions Screening OOS Preparation
. Pre Evolution Briefings j
Revised Briefing Sheets Upgrading Use of Operating Experience
. Human Performance Increased Structured Observations of Pre-job Briefs
. Leadership Role (SRI-2) 8
se
-.&s-n.r, A 4.s-
--eenn-
-,r-.
2 w.m
-.npu s.r-s-----a>
k.ss m a.
aa
--s-*
aa 24.-aa a.~nss+,-a..ana
.m.r-se-
.e r e m n. =..m m m mmeon..--
s-u-e
..-..,-e l
I m
i 5
i o
1 M
t
%m If
=
m%
M u
4
\\
m o
k E
O h
.5 t
3 N
u g
.m A
4 tlMD Cll
- 2 e
.M.
NM
Material Condition Indicators (Mods D
E/Rs
- r Inspections Annunciators System Challenges OE Temp Alts Nuclear Oversight,
OWAs (Controllers y
,c v
Backlogs Material Condition *-
r NWR, A/R, E/R SHIP
/
,\\
M w
r m
Scorecard Indicators e
3 SDC Reduction Safety System Performance Power History etc.
SILs/TILs 10
+
t
[
Maintenance Rule (a)(1)
\\
70 -
i E
60 I
j 50 -
N 40 -
$ 30 -
a Open C/A
$ 20 --
E in Monitoring 10 --
0 1
11
SYSTEM HEAL THINDICA TOR PROGRAM (SHIP) e0%.
50 %
e48%-
39 %
4 45%
46%
33 %
33 %
35%
29%
20%
13%
14 %
15%
N 18%
3 10%
13%
12%
11 %
1 0%
May-98 Jun-98 Jul-98 Aug-98 Sep-98 Month
+ Green = Excellent
-o_ White = Acceptable
+ Yellow =Needs improvement + Red =Not Acceptable Increase in Red Systems was due to criteria change in Rev. 3 of NSG-GOT to require system to be red if Maintenance Rule (a)(1) for Corrective Action 12
l Material Condition Status t
Operator Work Arounds Projected Added 8, Removed 18 3o -
25 -
Top Three -
2o -
~_
15 -
- U1 Gland Seal Supply 10 -
I.
i 5-t Regulator o
?
?
?
?
?
?
?
?
- U1 CRD Charging Water 6
k 4
6 6
,i 6
6 x
x
=
z Isolation Valve
- U2 Stator Cooling Water
-l Feed & Bleed t
13 i
[
I-Material Condition Status Projected Temporary alterations l
l I
25 l,,
- ,;l ll Added 32, Removed 27
=
sis.i sini si Three Oldest -
isiii susi si l.i.I I.i.i.I.i.e.i.I.i.
o
- Make Up Demineralizer Trailer
- 2B Reactor Building Floor Drain Sump
- 1F and 1G Backdraft Dampers Wired Open i
i
' i 14
Material Condition Status
}
I Lit Annunciators.
Both Units U1 - 3 Require Maintenance l4:
- Oldest July 24,1998 l2; 9
U2 - 2 Require Maintenance 8:
- Oldest August 9,1995 4-1 2-t 2 Normal Per Design l
o Top Three - Fuel Pool Pump s#
s# g j
/
e Discharge Low Pressure,1B a
g Recire Field Breaker Open, and Computer UPS or HVAC l
Trouble i
l i
15
E Material Condition Status s
Controllers in Manual
>> None in Control Room 3 in Plant Now,2 at End of Year
- 2 Condensate Demins and 1 Fuel Pool Demins I
I i
i l
16 t
t
i 1
r m
NON-OUTAGE CORRECTIVE MAINTENANCE BACKLOG r
t 4
I s
i j
F i
L w 1400 I
W re F
3 1200 i
L 0"
l e
i g
1000 __
j u
6 800--
f O
3.
Goal 499 r
F %
i O
A l
u 4ao ___
t I
e F.c 2ao -_
j 4
E L
s j
L Z o
i z
J e
a F
c i
~
3 3
3 W
O O
W j
7 m
O z
o
~
j
)
i FOCUS ON HIGH IMPACT WORK j
- Operations Prioritization Oct. data as of 10/30/98
- Using SHIP for Input I7 t
I
O a
Material Condition -
Preventative Maintenance
. Existing PM Program (8342 PMs) 95.2% of PMs Completed Prior to Due Date (Last Six Months)
[
Formal Control of Deferrals - System Engineer / Station Manager
. Performance Centered Maintenance Program to Improve PM Program
>> 70% Complete Now 100% Complete First Quarter 1999 I8
{
L RecentAccomplishments Scram, Derate, Challenge Reduction Review of 4 High Risk Systems (SILs, TILs, INPO, OE, BWROG, Dresden Experience)
- 486 Items Identified j
- 401 Items Closed Revised 18 RPS Test Procedures to Minimize Time in Half-Scram Revised 12 Operating Procedures to Reduce Derates n Revised CRD Procedures for more efficient Startup n Reviewed BWROG Scram Reduction Recommendations
- 17 Turbine Control System Mods Proposed
- Four EHC Modifications During QlR15 Revised Training to Improve EHC Maintenance Techniques HPCI Turning Gear Condensate Demineralizers 19
Station Performance 95 - 97 Jun - Sep798 Capacity Factor 54.4 %
89.1 %
Forced Outage Rate 31.4 %
4.5%
Unplanned LCOs 21 (1997) 7 Safety System Unavailability U-1 HP 0.0161 0.0155 U-2 HP 0.0029 0.0085 U-1LP 0.0113 0.0053 l
U-2 LP 0.0003 0.0000 EAC 0.0136 0.0100 20
t i
i i
t
+
CORRECTIVEACTION s
i f
6 1
I i
BillPearce Station Manager I
I i
I t
f 21 i
Corrective Action Program "What is it Telling Us?"
/. Continuing Configuration Control Events
/. Inconsistent Operations Leadership Standards
/. Continuing Material Condition Issues
. Ineffective Implementation of Work Management
. Ineffective Dose Control / Radioactive Material Control 1
. Inadequate Roll-Out ofXGG Common Procedures
e What the Corrective Action Program is Telling Us Ineffective Implementation of Work
~
Management NGG Wide Procedures Implementation - Not Process
-Corrective Actions j
- High Impact Team to Formulate Answers to Issues
- Comprehensive Work Management Action Plan
- Strengthened Work Planning Organization
- Holding Work Week Manager Accountable to Follow Process
- Realigned Work Planners, Work Week Managers and Systems f
Engineers to Special Work Weeks Within Work Scheduling Process
- Departmental Work Management Indicators f
l 23
t What the Corrective Action Program is Telling Us Dose Control / Radioactive Material Control Exposure Control
-Corrective Actions
- Benefit of Zine and Source Term Reduction Seen in Recent Unit 2 Outage
- Chemical Decon of Recire Discharge Piping
- U1 Zine Injection 4 Weeks Prior to Chemical Decon
- Aggressive Shielding (Approximately 90 Tons)
- Hydrolazing and Flushing of Systems and Components Radioactive Material Control
-Corrective Actions
- Survey Techniques and Expectations Training for RP Techs
- Heightened Level of Awareness - All Quad Cities Employees
- Management Oversight in Field 2
i
- Reduced Equipment and Material Entering and Leaving RPA 24 i
i
What the Corrective Action Program is Telling Us Inadequate Roll-Out ofNGG Common Procedures Common Procedure Implementation Follow-through Inadequate i
>> Corrective Actions
- Evaluate Impact of Common Procedures on Station Procedures l
- Establish Implementation Plan Including Training
- Assess Effectiveness ofImplementation l
25
4 i
I TechnicalPrograms Continuing Focus on Improvement Activities Currently Not Highlighted as a Problem Area in Corrective Action Program Key Programs ISI/IST MOV/AOV i
Heat Exchangers (89-13)
t f
26 i
I i
i I
I i
)
i APPENDIXR t
[
I John Garrity 1
Fire Protection Improvement Project Manager 4
m I
27 l
INTEGRATED SET OF FIRE PROTECTION IMPROVEMENT ACTIVITIES NRC Weetings O
^
=
8-13-98 9-19-98 18-08-98 11-19-98 W
0=**4 Fam*4 De**e)
Reduce CDF M del Raady For n
Fire Risk Model Ready For n
- Rs IE
% Rid Model a a
Sensitivity Runs Evaluation of Modifications.
[
~
125V DC Irnprovement Identify Modifications m
e~g ge SSD Anafysis Coble Mopping g_g Sto* ion Radios Re-Program 3
p Evocuaten Reduced Identify Additianol Unit Independence Study Scope, Plan a T g Equipment Availotde g g Ir.
ement rogram l
l 4
Evoluote Existing SSA l
l m
MuR:ple Circus Failures Confirm Conservatism l g g
Q
$ - Actual Stort/ Completion After 8/13/98 In Timeline I
$ - Actual Stort/ Completion Prior To 8/13/98 I
O - schedute Stort/Fmish Cor'1piance 64drix gQSA Assessmentg g
i I
i Design Mods EEminate CM for a
Ciminate CM for a
Errirete CM for g
Decision on WODS to FW Oil Transfer
$80 Co*
/
M p. Recire
9' Review Cun-@stey Woosures(CM) g ro protection I..
..a (r= seats, combustibie tood coics. Detecten suppression, smoke) g I
Fire Protection Improvement Plan
}
CompletedActions l
. Compliance Matrix
. Multiple Spurious Operations Study i
. Equipment List for New Systems Generated j
. Identificatiori and Routing of Cables for Components on Equipment List 1
. Reprogrammed Station Radios
. El Fuel Oil Transfer Pump Mod
. U2 SBO Cable Re-route Mod 1
3 Mods Scheduled for Q1R15 j
29
~
i t
Integration Phase
. Start Integration Phase Complete November 25,1998 l
i
. Next Technical Meeting
>> Tentative November 19,1998
(
3 Milestones and Commitments Met t
Program on Schedule J
30
Tech Spec Surveillance Performance
. Strongly Controlled Station Manager Approval
. Q2P02 Rescheduled to February 20,1999
>> 105 Outage Related Surveillances Done Prior to Startup Grace Period Will be Used for'28 Outage Related Surveillances
- Engineering Review of Operating History 31
t CLOSING REMARKS Progress j
Focused on Further Improvements Material Condition Appendix R
>> Work Management Other Technical Programs Problem Identification and R.esolution i
t
[
32 l
f i
-