ML20195E988
| ML20195E988 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/06/1988 |
| From: | Richardson P AFFILIATION NOT ASSIGNED |
| To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-00492, 53FR16435-492, NUDOCS 8806240181 | |
| Download: ML20195E988 (1) | |
Text
. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ - _.._ _ _ _ _ _ _ _
g
$b FR I 3&
E 3: -9 P 5 :42 June 6, 1988 Samuel J. Chilk n...
Secretary of the Commission Attention: Docketing U.S. Nuclear Regulatory Commissio.n and Service Branch 1717 H Str'eet, N.W.
Washington, D.C.
20555 Dear Sir On May 9,.1988, the Nuclear Regulatory Commission (NRC) published a proposed change to its emergency planning requirements for fuel loading and low-power operation of nuclear power plants.
The proposed rule change would eliminate m4ny existing low power licensing requirements, including offsite emergency response plans, any public-notification systems (including sirens), and the training of offsite emergency-response personnel.
As a resident of the Seabrook nuclear plant area, I vigorously oppose the proposed amendment to existing safety requirements.
The proposed rule has been developed with only the utility's interests in mind.
The NRC is once again moving to place the public at risk for the sole purpose of allowing Seabrook Station to obtain a low-power license, even though the question of whether it will ever be granted a full-power license is seriously in doubt.
In the interest of public safety, I urge the Commission to reject the proposed rule change.
All offsite emergency response planning requirements must be in place before allowing any degree of risk to the public, including risks from low power operation.
Sincerely, bnkk 0E Name and Address:
pal %A RlWEM
- 2. TLOM B05R DMMS
- MGIQBORY, MADMC\\
8806240181 000606 PDR PR g
Q 50 53FR16435 PDR
. -.