ML20195E961
| ML20195E961 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 05/21/1988 |
| From: | Gillespie M AFFILIATION NOT ASSIGNED |
| To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-00512, 53FR16435-512, NUDOCS 8806240174 | |
| Download: ML20195E961 (1) | |
Text
5/
- s7>
(63 FRHes)
-9 5
May 21, 1988 Samuel J. Chilk Secretary of the Commission Attention: Cocketing U.S. Nuclear Regulatory Commission and Service Branch 1717 H Street, N.W.
Washington, D.C.
20555 Dear Sir On May 3, 1998, the Nuclear Regulatory Commission (NRC) published a proposed change to its emergency planning requirements for fuel loading and low power operation of nuclear power plants.
The proposed rule change would eliminate many existing low pcwer licensing requirements, including the followings offsite emergency response plans, any public notification systems (including sirens), and the training of offsite emergency response personnel.
As a resident of the Seacrook nuclear plant area, I vigorously oppose the proposed amendment to existing safety requirements.
The proposed rule has been developed with only the utility's interests in mind.
The NRC is once again moving to place the public at risk for the sole purpose of allowing Seabrook Station to obtain a low power license, even though its ability to be granted a full power license is seriously in doubt.
in the interest of public safety, I urge the Commission to reject the proposed rule change.
All offsite emergency response planning requirements must be in place before allowing any degree Of risk to the public, including risks from low power operation..
Sincerely, OC Name andu ddressy El dxuhich 5t hubk acet TW 0R Sr i
8806240174 880521 PDR PR PDR 50 53FR16435 05/0
'