Text
__
5 31
..u s a
..t (5S FR /6935) is m. -9 P 5 3 June 6, 195e Samuel J. Chilk Secretary of she Commission Attenticn: Docketing U.S.
Nuclear Regulatory Commission and Servire Branch 1717 H Street.
N.W.
Washington, D.C.
205S5
Dear Sir :
On May 9, 1988, the Nuclear Regulatory Commission (NEC) published a proposed change to its emergency planning requirenents for fuel loading and low-power operation of nuclear power plants.
The proposed rule change would eliminate many existing low-power licensing requirements, including offsite emergency response plans. any public-notification systems (including sirens), and the training of offsite emergency respcnse personnel.
45%Chu & D \\ hk M MWC$$ [O L
As a resident of,gthe Seabroox. nuclear plant area, I vigorously oppose the proposed amendment to existing safety requirements.
The proposed rule has been developed with only the utility's Interests in mind.
The NRC is once again moving to place the public at risk for the sole purpose of allowing Seabrook Station to obtain a low-power license, even though the question of whether it will ever be granted a full-power license is seriously in doubt.
In the interest of public safety. I urge the Commission to reject the proposed rule change.
All offsite emercency response planning requirements must be in p; ace before allowing iny degree of risk to the public, including r ; s:.s fr o. Iow-power operation.
8806240167 880606
~~"-~re*
PDR PR
- sn-a t..
50 53FR16435 PDR Name end Address k
b b'7
(/
ggf
't Fosta o,u___
Enus-
, MA 0254 0 slo