ML20195E601

From kanterella
Jump to navigation Jump to search
Notifies of Plans to Add Taylor to Operating Staff as Shift Operations Advisor.S Taylor Exceeds Experience Criteria Required by Section 2.C.12 of Ol.Resume of Taylor Encl
ML20195E601
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/29/1986
From: Agosti F
DETROIT EDISON CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
VP-86-0059, VP-86-59, NUDOCS 8606090155
Download: ML20195E601 (3)


Text

_

ce P s ent o

Nuclear Operations DOf(OlY WY reams s Edison s?ABF""

W gr.v.

May 29, 1986 4

VP-86-0059 Director of Nuclear Reactor Regulation Ms. Elinor G. Adensam, Director Project Directorate No. 3 Division of BWR Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ms. Adensam:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Shift Operations Advisor Detroit Edison is planning to add Mr. Stanley Taylor to the operating staff as a shift Operations Advisor (SOA).

i Mr. Taylor's resume-is attached.

Mr. Taylor exceeds the experience criteria required by Section 2.C.12 of our operating license and will be trained and examined in accordance with the same section before assuming his duties as an SOA.

If you have any questions concerning this matter, please contact Mr. J. T. Coleman at (313) 586-4133.

Sincerely, n

- Md Attachment cc:

Mr. M. D. Lynch Mr. W. G. Rogers USNRC Document Control Desk Washington,'D.C.-20555 1

8606090155 860529 gDa ADocxOsooOg2 y,

RESLME T STAEEY K. TAYIDR EDUCNPION 1969 Georgia Southern College, Statesboro, Georgia 1967 Graduate - Coffee County High School, Douglas, Georgia TRAINING 1985 SIO Certification Instructor Training - Shearon Harris IAlclear Power Plant Sinulator 1972 Maintenace Schools - Fleet Ballistic !!issile Training Center

- U. S. Navy 1971 Basic 1Alclear Power School - U. S. IMvy 1971 "A" School - Great Lakes Training Center - U. S. Navy AFFILIRFION/CERTIFICNFION/REGISTRMPICE 1981 Senior Reactor Operator License #ST-4026 - Brunswick Steam Electric Station 1979 Reactor Operator License #T-4944 - Brunswick Steam Electric Station EKPERIE3CE 10/85-Present C.D.S. Technologies - Susquehanna Steam Electric Station (1050

!@le BWR) - Procedure Writer - Responsible for revision of operations procedures to incorporate changes in control room design involving human factors studies.

1976-10/85 Carolina Power and Licht C N 01/85-10/85 Shearon Harris Ehergy and Environmental Center - Senior Reactor Operator Trainee (PWR) - involved in training to receive a PWR senior reactor operator certification. Rewrote lesson plans for non-license operator courses to meet Il50 criteria as well as CP&L jot task analysis.

SfAEEY K. TAYII)R Page 2 1976-12/84 Brunswick Steam Electric Station (790151e, BWR) 1982-1984 Shift Foreman (SRO) - Responsible for daily managenent of control room activities including issuing work requests, writing and issuing limiting conditions of operations (LCO's) and coordinating surveillance and maintenance testing. Also responsible for all refueling and core alterations.

1980-1982 Senior Control Operator (SRO) - Responsible for same activities as shift foreman with exception of personnel management. Served as outage coordinator for ten months.

1978-1980 Control Operator (RO) - Responsible for manipulation of reactor plant controls. Duties also included development, review and revision of all operating procedures including emergency, standard and alarm response procedures.

1976-1978 Auxiliary Operator - Responsible for all non-licensed activities including valve manipulation, visual inspections and assisting in surveillance testing.

1970-1976 U. S. Navy - Ibclear Trained Machinist Mate - Stationed on USS Von Steuben - qualified on all machinery division watch stations and engine room supervisor. During last two years, position was

" leading first" of machinery division and was in charge of all primary and secondary plant maintenance.