ML20195D831

From kanterella
Jump to navigation Jump to search
Confirms Dates of 881108-10 for NRC Insp 99900401/88-01 at Licensee Ofcs Re Use of Litton-Veam Electrical Connectors in Nuclear Power Plants
ML20195D831
Person / Time
Issue date: 11/02/1988
From: Brach E
Office of Nuclear Reactor Regulation
To: Mawhinney W
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
REF-QA-99900401 NUDOCS 8811070144
Download: ML20195D831 (1)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

NOV 01 1988 Docket No.: 99900401/88-01 l

Mr. Walter Mawhinney, Vice President l

Nuclear Quality Systems Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095

Dear Mawhinney:

1 i

This letter confirms the dates of November 8 through 10.1988 for an l

NRC inspection at your offices. These dates were established in an October 27 telephone conversation between T. Swift and others of your staff and R. C. Wilton of this office. The inspection will relate to the use of Litton-Veam electrical connectors in nuclear power plants.

Your cooperation concerning this matter will be appreciated.

Sincerely, r

Originf signed by t, y;w g;gy E. William Brach, Chief

(

Vendor Inspection Branch r

l Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation i

DISTRIBUTION:

RID 5 Code-!E:09 -

VIB Reading DRIS Reading BGrimes I

EBrach i

UPotapovs RW11 son

  • SEE PREVIOUS CONCURRENCE
  • l VIB:DRIS SC:VIB:DRIS BC
DRIS l
  • RW11 son:jh
  • UPotapovs
  • E ch l

l 10/31/88 10/31/88 10A3t188 l

r l

[

i ff01 I

hh 9

'o p

9990040s l

_ _ - _ _,