Forwards Rev 9 to Physical Security Plan,Reflecting Changes, Including Reassignment of Alternate Power Source from Bus E9 to Security Sys Diesel Generator & Physical Relocation of Secondary Alarm Station.Rev Withheld (Ref 10CFR73.21)
ML20195D746
Person / Time
Site: Beaver Valley
Issue date: 05/19/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8606050033
Download: ML20195D746 (2)


Text

r

~

SAFEGUARDS INFORMATION 4 //

r-as4

+

QVg u - 41

~y45 avvA Telephone (412) 393-6000 Nuclear Group SkpYgport, PA 15077-C004 Y

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Attn:

Dr. Thomas E. Murley Regional Administrator Region 1 631 Park Avenue King of Prussia, PA 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Physical Security Plan Gentlemen:

Enclosed is Revision 9

to the Beaver Valley Power Station Physical Security Plan (PSP).

Revision 9 reflects four changes: (1) the reassignmant of Security's Alternate Power Source from the Station's E9 buss to the Security System Diesel Generator supplied

buss, (2) the physical relocation of the Secondary Alarm Station (SAS) and supervisory status for its' operators, (2) the relocation of the west side Protected Area Barrier, and (4) the placement of temporary structures within the protected area for the Fifth Refueling Outage.

A summary of these changes is also attached to aid in your review.

These changes have been reviewed and judged not to constitute a degradation to the previous commitments in the PSP.

These

changes, since they do not decrease the safeguards effectiveness of the Physical Security Plan, are being submitted in accordance with 10CFR50.54(p).

The enclosed materials are considered proprietary under the provision of 10CFR2.790(d),

and Safeguards Information under the provisions of 10CFR73.21, and thereby exempt from public disclosure.

If you have any questions concerning this matter, please contact my office.

Very tr y yours, 8606050033 860519 PDR ADOCK 05000334 F

PDR J. J.

Carey Vice President, Nuclear E N C L O S U R E S C 0 tl T AIR S A F E G U A R D S Enclosures lNf 0RMAT10H. UP0M SEP ARATlota 1

i hI Tnits P ACE IS DECONTROLLED i

SAFEGUARDS INFORMATION

<l$e v:r Valley Powsr Station, Unit No. 1 Dockst No. 50-334, Lictnso No. DPR-66 Physical Security Plan Page 2 cc:

Addressee (6 copies of enclosures)

Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission (without enclosures) c/o Document Management Branch Washington, DC 20555

. Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn:

Mr. Peter S. Tam, Project Manager Proiect Directorate No. 2 Division c.

PWR Licensing - A Washington, DC 20555 Mail Stop 340 -

-