Responds to NRC Re Violations Noted in Insp Repts 50-295/88-20 & 50-304/88-20.Corrective Actions:Errata to Jan-June 1988 Radioactive Release Rept Submitted on 880926 & Included Data Re Solid Radwaste Shipped Offsite
ML20195D650
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/25/1988
From: Tryzna G
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
5262K, NUDOCS 8811070092
Download: ML20195D650 (2)


Text

_ _ _- . _ _ _ _

s ,

~

' ,i%*-

_,/C')- Commemveth Eh tilmoia '

- 6' '

~

. One Flest National Plata, Chir.aqo.  !

l\ C ) .. Address Reply t : Post Offica Box 767 '  !

/ Chicago. Ilknols 60690 i

October 25, 1988-Mr. A. Bert Davis ,

Regional Administrator-Region III t US Nuclear Regulatory Comuniusion 799 Roosvelt Road ,

Glen Ellyn, 11 60137

Subject:

Zion Nuclear Power Station, Units 1 and 2 Response to NRC Inspection Report No.'s '

50-295/88020 and 50-304/88020  !

NRC.PoskeLHQa.iJLJQ-2Si.And_5C 3Di j Referencet September 27, 1988 letten; from W.D. Shafer to Cordell Reed Dear Mr. Davist I l

This letter is in response to the inspection conducted by W. J. Slawinski of f your office frem August 31 through September 2, 1988 of activitles at the Zion  !,

Nuclear Power Station. The referenced letter indicated that certain activities ,

appeared to be in noncompliance with NRC requirements. Cocenonwealth Edison i Compary's response to this violation is pros.1ded in the Attachment to this letter.

Please direct any questions that you may have to this office.

F Very truly yours,  ;

/

G. E. Trysna j Nuclear Licensing A&ministrator n

i F

sel [

ces NRC Resident Inspection-Zion j 5262K  !

s  ;

P g10}%%$$ $$$0h 00T 17 GB3 Q

( - .- . .. _ _ _ _ . .--__

I <

,g*

ATTACIDir.NT ZiQiJiU. CLEAR PGfEILSTATIOli htSEGISE_TQ_liQTICLOLY10LATIGI YIOLATIQi Technical Specification 6.6.1.D requirJs that the Semlannual Radioactive Release Report include certain minimum data, including specific information (eg.

container volume, curie quantities, radionuclides, etc.) for each type of solid radioactive waste shipped offsite during the report period.

Contrary to the abcVe, the Semlannual Radioactive Release Report for January through June 1988 did not include data regarding solid radlonctive waste shipped offsite during the report period.

This la a Severity Level V Violation.

COR R ECT1YI_ACT1QLTA K EILRID_E E SU LTS_ ACllIIVID Two actions have been taken to correct the violation. First, an errata to the January through June 1988 Radioactive Release Report was submitted on September 26, 1988, and included the date regarding solid radioactive waste shipped of f sli) during the period. Second, the Technical Specification requirements for the report were reviewed by the individuals responsible for preparing the report. This review was conducted to assure that Individuals responalble for the report were made aware of the full requirements of the content of the report.

CORRECT 1YLACTIott TO_BLIAKEILIQ_AYQID..filRTilELY10 LATINI Additional action to prevent further violations will be to revise the computer entry in the station Technical Speelfication surveillance program which addresses the report, to clearly state tl.e required contents of the report.