ML20195C289

From kanterella
Jump to navigation Jump to search
Errata to Amends 104 & 104 to Licenses NPF-37 & NPF-66, Respectively,Correcting TS Page
ML20195C289
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/04/1998
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20195C294 List:
References
NPF-37-A-104, NPF-66-A-104 NUDOCS 9811170073
Download: ML20195C289 (2)


Text

. - -.. _ _ _ - _ _ _ - _ -

1 TABLE 3.3-4 (Continued)

~

C f

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS 88-69 TRIP ALLOWABLE FUNCTIONAL UNIT SETPOINT VALUE

'a:

S ^"*" * '**d*"' (

"""*d )

EaS u

f.

Division 11 for Unit 1 (Division 21 for Unit 2)

T ESF Bus Undervoltaga-Start Motor-Driven Pump 2870 volts 2730 volts.

g.

Auxiliary Feedwater Pump Suchon Pressure-i Low (Transfer to Essential Service Water) 218.1 psia 217.4 psia

7. Automatic Opening of Containment Sump Suction i

isolation Valves a.

Automatic Actuation N.A.

N.A.

Logic and Actuation Relays b.

RWST Level-Low-Low 46.7 %

44.7 %

Coincident with Safety injection See item 1. above for Safety injection Trip Setpoints and Allowable Values.

)

1 BYRON - UNITS 1 & 2 3/4 3-27 AMENDMENT NO.104; 104

_. - _ - _... _ _ _. _ _.. _. _ _. _ _.. _ ~

PLANT SYSTEMS

' CONDENSATE STORAGE TANK LIMITING CONDITION FOR OPERATION 3.7.1.3 The condensate storage tank (CST) shall be OPERABLE with a contained water level of at least 60%* (75%").

[

' APPLICABILITY: MODES 1,2, and 3.

j ACTION-With the CST inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:

i t

a.

Restore the CST to OPERABLE status or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, or b.

Demonstrate the OPERABILITY of the Essential Service Water System as a backup supply to the auxiliary feedwater pumps and restore the CST to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.3.1 The CST shall be demonstrated OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying i

the contained water level is within its limits when the tank is the supply source for the auxiliary

- feedwater pumps.

4.7.1.3.2 The Essential Service Water System shall be demonstrated OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by performing the surveillance specified in Specification 4.7.4a. whenever the Essential Service Water System is the supply source for the auxiliary feedwater pumps.

)

t t

i

  • Applicable to Unit 1 and to Unit 2 after Cycle 7.

"Not applicable to Unit 1. Applicable to Unit 2 through Cycle 7.

i BYRON - UNITS 1 & 2 3/47-6 AMENDMENT NO. 104; 104

- -