ML20195C248

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1988 for Joseph M.Farley Nuclear Plant,Unit 2
ML20195C248
Person / Time
Site: Farley 
Issue date: 05/31/1988
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806220163
Download: ML20195C248 (5)


Text

_ _

t.

JOSEPli M. FARLEY NT) CLEAR PLANT UNIT 2 NARRATIVE SUFNARY OF OPERATIONS May, 1988

- During the month of May, there were no unit shutdowns or significant power reductions.

On May 26, atmospheric relief valve Q2N11PCV-33710, lifted due to personnel error.

Instrumentation and Controls personnel performing surveillance testing of the valve failed to follow procedure.

The following major safety-related maintenance was performed in the month of May:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

8806220163 880531

/

3 PDR ADOCK 05 COO 364 I

R DCD

_ _.. ~.. _ _ _ _ _ _ _ _ _ _..

c.

l '

OPERATING DATA REPORT DOCFEf No.

50-364 IWIE _6/7/88 l-COMPLE'IED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STA'IUS Notes

l. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

May, 1988

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2,6E'.

7-30-81, date of

4. Nameplate Rating (Gross MWe; 860' commercial operation
5. Design Elect;rical Rating (Net nWe): B29 -'
6. Maximum Dependable Capacity (Gross MWe):

863.8

7. Maximum Dependable Capacity (Net MWe):

822.8

8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Not MWe):

N/A

10. Reasons For Restr.'.ctions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative 11.11ours In Reporting Period 744 3,64's 59,952

12. Number Of flours Reactor Was Critical 744.0 3,647.0 56,540.9
13. Reactor Reserve Shutdown Ilours 0.0 5 U-138.0
14. Hours Generator On-Line 744.0 3,667 U~

50,895.6

15. Unit Reserve Shutdown 11ours 0. G-TT 0.0
16. Gross Thermal Energy Generated (IMI)

E97U662 9,631,515 T28,974,787 l

17. Gross Electrical Energy Generated (twi) 651,190 TI97,908 42,401,124
18. Net Electrical Energy Generated (MWil) 621,010 3,049,580 40,201,318
19. Unit Service Factor 100.0 100.0 84.9
20. Unit Availability Factor 100.0 100.0 84.9
21. Unit Capacity Factor (Using MDC Net) 101.4 101.6 82.2
22. Unit Capacity Factor (Using DER Net) 100.7 100.9 80.9
23. Unit Forced Outage Rate 0.0 0.0 5.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY DT7f4 81 657257i4 -

/

COMMERCIAL OPERATION D6701/81

_U7230g 01

'\\

\\\\

/

Form 2/30 L_

DOCKET NO.

50-364

'~

UNIT 2

DATE JUNE.7, 1988 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 N

M L _.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l'

-841 17 831 2

841 18 836 3

839 19 834 4

837 20 832 5

838 21 830 6

839-22 826 7

-840 23 828 8

840 24 827 9

837 25 831 10 833 26 837 11 838 27 838 ll 12 839 28 835 L

13 837 29 832

-14 836 30 829 15 835 31 828 t

16 832 i

' INSTRUCTIONS on this format, list the average daily unit power level in ifde-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

UNIT SHUTDOWNS AND POWIR REDUCTIONS DOCKET ro.

50-364 UNIT NAME J.

M. FARLET - UNIT Z DATE JUNE 7, 1988 COMPLETED BT D.

N. MORET REPORT MONTH MAT TELEPHONE (2051899-5156 l

l l

l l

l METHSD OF l LICENSET.

l l

l CAUSE & CORRECTIVE l

j l

l l DUPATION l l SHUTTING l EVCNT l STSTEM l COMPONENT l

ACTICN TO l

lr0.

l DATE l""!?E l t !!OURS I l REASON l DOWN REACTOR l REPORT a l CODE l CODE l

PREVENT RECURRENCE l

I i

i i

I I

I I

i lTHERE WERE No UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE MONTH OF MAT.

l l

l i

i I

l I

I I

I i

i l

i i

i I

1 1

I I

I i

I I

I I

I I

I I

I I

I I

i i

i I

i I

I I

I I

i I

I I

i I

I i

i i

l I

I I

I I

I i

i 1

I I

I I

I I

I i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

I I

I I

I I

I I

i l

i I

i i

i I

I I

I I

i i

l I

i 1

1 I

I I

I I

I I

I I

I 1

i l

i l

i i

I I

I i

i i

I i

1 I

I i

I I

I i

l i

l i

i i

I I

I I

I I

i i

l i

l I

i l

i i

i i

i i

i i

i l

i I

F: Forced Reasen:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Faelure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Autonatic Scram.

Event Report (LER) File (::UREG-D-Regulator 7 Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-A31nis tr a ti te Exhibit I -Same Source G-Operational Crror (Explain) t9/77)

It-Ocher (Explain)

H E EtIn 1/2

l I

e a

y m

4 f

l e

4

  • i

~

//

s '@

u?q','fsi,'" O n.

f k?'qu I

I h

l I

4 i

l

e

- Alabsma Powsr Company

  • ~

< 600 North 18tn Street Post Office Box 2641 Birmingham. Alabama 352914400

~ Telephone 205 250-1837

{

W. G. Hairston,111 Vice President Nuclear Generation AlabamaPower the soutten doctre system June 13, 1988 Dockot No. 50-364 U. S. Nuclear Regulatory Connission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly, h /~

At W. 'G. Hairston, III v

WGH/JGS:mab/1.6 Attachments xc:

Dr. J, N. Grace l

l I