ML20195C120
| ML20195C120 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/27/1988 |
| From: | Mcburnett M HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20195C125 | List: |
| References | |
| NUDOCS 8811020360 | |
| Download: ML20195C120 (2) | |
Text
,
e The Light company P.O. Ilox 1700 llouston. Texas 77001 (713) 228 9211 llouston IJghting & Power October 27 1988 STllLAE-2534 File No.: T 08.02 10CFR50 U. S. Nuclear Regulatory Con.nission Attention:
Document Cont M. Desk Washington, DC 20555 South Texas Project Electric Generating Station Unit 1 Docket No. STN 50 498 Transmittal of Unit 1 Amended PSI Summary Report for Welds to NRC Enclored are four sets (2 volumes / set) of the "Amended Preservice Inspection Sumanry Report for Class 1 and Class 2 Pressure-Retaining Components at t. o South Texas Project Electric Generating Station - Unit 1".
This amended sumrnary report documents the PSI weld examinations performed on STPECS-1 prior to commercial operation (August 15, 1988), including the exatnin W ons performed subsequent to our filing of the original Unit 1 PSI veld su= nary report on April 1,1987 (ST-liL-AE-2019).
This amended PSI summary report documents llouston Lighting and Power Company's cortpletion of the PSI examinations required by the ASME Section XI Code for welds in Class 1 and Class 2 coreponents and the augmented inspection programs, as described in this report, on STPEGS 1.
If you should have any questions on this matter, please contact Mr.
A. W. liarrison at (512) 972 7298.
h h
(
M. A, McBurnett Manager.
Operatione Support Lker. sing AVll/RLB/hg
Attachment:
Amended Preservice inspection Summary Report for Class 1 and Class 2 Pressure-Retaining Components (Unit 1).
Bool i
n ')
I L4 NRC/cu g
/
A Subsidiary of Ilouston Industries Incorporated pgp 8811020360 881027 PDR ADOCK 05000498 Dd E Q
PDC w
imuston Lighting & Power Comp.my S
L 28 Page 2 cc:
- Regional Administrator, Region IV Rufus S. Scott
- lear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1/00 Houston, TY.
77001 George Dick, Project Manager U.S. Nuclear Regulatory Commissicn INPO Vashington, DC 20555 Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, CA 30339-3064 Senior Resident Inspector / Operations c/o U.S. Nuclear Regulatory Dr, Joseph M. Hendrie Comnission 50 Be11 port Lane P. O. Box 910 dellport, NY 11713 Bay City, TX 77414 J. I. Tapia Senior Resident Inspector / Construction c/o U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)
Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296
(*) Distribution without attachments Revised 08/24/88 L4/NRC/cu