Category:E-Mail
MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
From: Rankin, Jennivine Sent: Friday, July 10, 2020 6:27 AM To: Vogtle PEmails
Subject:
FW: ITAAC Discussion Items Attachments: ITAAC Discussion Items.docx; Sketch of RNS from CLP to DVI.pdf Presentation material for public meeting with SNC on July 16, 2020.
From: Petrak, Tom G. <TGPETRAK@southernco.com>
Sent: Thursday, July 9, 2020 4:09 PM To: Hall, Victor <Victor.Hall@nrc.gov>
Cc: Beilke, Robert Leo <X2RLBEIL@southernco.com>
Subject:
[External_Sender] ITAAC Discussion Items
- Victor, Here are the ITAAC discussion items we discussed along with a information only flow diagram that helps to describe the various flowpaths.
Tom Petrak
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 575 Mail Envelope Properties (SA9PR09MB5999CF04853F01F2496AF35E98650)
Subject:
FW: ITAAC Discussion Items Sent Date: 7/10/2020 6:27:00 AM Received Date: 7/10/2020 6:27:03 AM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: SA9PR09MB5999.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 583 7/10/2020 6:27:03 AM ITAAC Discussion Items.docx 16988 Sketch of RNS from CLP to DVI.pdf 704799 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
ITAAC 375 - RNS Pump Flow to RCS - Not Targeted See attached simplified flow diagram
- 1. RNS mid-loop flow test (Hot leg - RNS Pump - RCS) o Test initially performed SAT in December of 2019 with temporary orifices believed to be smallest expected diameter.
o During CMT testing, A train orifice diameter was reduced from 4.517 to 4.45. B train orifice diameter did not change.
o Test reperformed on July 3rd with SAT test results. As expected, A train flow reduced slightly and B train flow remained the same.
- 2. RNS cask loading pit flow test (Cask loading pit - RNS Pump - RCS) o Test initially performed SAT in December of 2019 with temporary orifices believed to be smallest expected diameter.
o During CMT testing, A train orifice diameter was reduced from 4.517 to 4.45. B train orifice diameter did not change.
o Plan is to credit the July 3rd RNS mid-loop flow test for the discharge side of the RNS pumps and the December 2019 cask loading pit test for the suction side.
- 3. Check valve RNS-V013 o Transfer open test completed SAT. Test was performed under dual pump operation.
o The check valve had to be disassembled and the seat lapped due to excess seat leakage.
o Post maintenance test performed (dual pump operation) during the ADS Stages 1-3 flow resistance testing. (IRWST - RNS Pumps - ADS Stages 1 IRWST).
- 4. Check Valve RNS - V017B o Transfer open test completed SAT. Test was performed under dual pump operation. (Hot leg - RNS Pumps - RCS) o Valve had to be disassembled to perform a weld inspection.
o Post maintenance test performed during CMT holdup test. (IRWST - RNS Pumps - RCS)
ITAAC 216 - PXS Check Valves Position - Targeted
- 1. Check Valve PXS -V122B o Tested open during IRWST injection flow resistance test. Valve opened but position indication failed to show open.
o Initial test plan required a change in position indication to show valve closed.
o Maintenance of the position indicator failed to show valve open during re-test o Plan to use leak test of the check to show valve closure.
- 2. Check Valves PXS - V016A&B, V017A&B o Use a demin water source to test check valves.
o To date the demin water sources used have had insufficient volume and/or flow capacity to test the valves o A new plan using China OE is being developed.
ITAAC375:RNSFlowpathfromCaskLoadPit(Item9c)andfromRCSHotLeg(Item9b)
HotLegFlowrate Accept.Crit.1400gpm ARNSPump
InitialTest-2018gpm CVSReturn Retest-1988gpm BRNSPump InitialTest-1992gpm M
Retest-1992gpm M M
FromRCSHotLeg From RC RCS RNSV022 RNSV002A RNSV001A Y
FromIRWST CaskLoading
L Pit RNSFT001A N PXSR01A M
M
MV RNSV055 RNSV056 MV RNSME 01A RNSV006A RNSV007A V011 011 RNSV011 RNS RNS V013 RNSV013 O RNSV015A RNSV017A Original
4.517" Replaced
RNSMP 4.45" CLPFlowrate 01A N Accept.Crit.1100gpm ARNSPump
FromCMTA 2241gpm RNSV008A BRNSPump 2133gpm I O ReactorVessel FlowpathfromCaskLoadingPitOnly FlowpathfromRCSHotLetOnly CommonFlowpath A T RNSFT001B R
M FromCMTB RNSV006B RNSV007B MV RNS NSMP M
RNSMP RN ME RNS RNSME 01B R PXSR01B 01BB F O RNSV015B RNSV017B Original
4.42" RNSV008B IN