7/29/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Dresden Nuclear Power Station and Quad Cities Nuclear Power Station Performance for the 2019 Calendar Year
ML20191A061
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 07/08/2020
From: Kenneth Riemer
NRC/RGN-III
To:
References
Download: ML20191A061 (4)


Text

July 8, 2020 NOTICE OF PUBLIC MEETING Licensees: Exelon Generation Company, LLC Facilities: Dresden Nuclear Power Station, Units 2 and 3 Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos: 50-237; 50-249 (Dresden) 50-254; 50-265 (Quad Cities)

Date/ Time: Wednesday, July 29, 2020 5:30 p.m. CDT Location: Webinar (advance registration required)

Purpose:

The NRC staff will host a webinar to present the NRCs assessment of safety performance at Dresden and Quad Cities for 2019, as described in the 2019 annual assessment letters. Following the presentation, the NRC will respond to questions specific to the safety performance of the stations and the NRCs role in ensuring safe plant operations.

NRC Attendees: K. Riemer, Chief, Division of Reactor Projects (DRP), Branch 1 A. Nguyen, Senior Resident Inspector, Dresden R. Murray, Senior Resident Inspector, Quad Cities Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for the sites during 2019. Then, following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance and the NRCs role in ensuring safe plant operations. The NRC staff will provide guidance during the webinar on the methods available to ask a question. Alternatively, questions may be submitted in advance to Kenneth.Riemer@nrc.gov.

Interested members of the public must register at the internet address below to see the visual portion of the presentation. In addition, interested members of the public must call in at 1-800-857-5740, passcode 9957711 in order to hear the audio portion of the presentation because the video portion of the presentation will have no sound. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through their telephone. There is also the option to join via phone only by calling in to the number above.

In order to participate, please register for the webinar no later than one business day prior to the July 29, 2020, meeting at:

https://usnrc.webex.com/usnrc/onstage/g.php?MTID=e8c64142961bb4b1 16b9590baa4ab167f System Requirements for Attendees for the webinar:

https://help.webex.com/en-us/1vek5r/Webex-Meetings-SystemRequirements-and-Cross-Platform-Information#Webex-Meetings-SuiteSystem-Requirements If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.

Meeting

Contact:

Ken Riemer, Projects Branch 1 (630) 829-9628 E-mail: Kenneth.Riemer@nrc.gov The NRCs annual assessment letters regarding each sites performance during 2019 (2019q4) can be found at: https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html. Additional information related to the NRCs annual assessment process and the safety performance of each site can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this webinar or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the July 29, 2020, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved By: /RA/

Kenneth Riemer, Chief Projects Branch 1 Division of Reactor Projects

DISTRIBUTION:

Jessie Quichocho, Region III Coordinator, OEDO Elise Burket, Region III Coordinator, OEDO Russ Felts, Deputy Director, Division of Reactor Oversight, NRR RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrPMQuadCities Resource Julio Lara, Director, Division of Reactor Projects, RIII Billy Dickson, Acting Deputy Director, Division of Reactor Projects, RIII Mohammed Shuaibi, Director, Division of Reactor Safety, RIII David Curtis, Deputy Director, Division of Reactor Safety, RIII Kenneth Riemer, DRP Branch Chief April Nguyen, SRI, Dresden Robert Murray, SRI, Quad Cities DRS Branch Chiefs:

Ann Marie Stone Karla Stoedter Richard Skokowski Patricia Pelke Steven Orth Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs ADAMS Accession Number: ML20191A061 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME CPhiliips:bw via KRiemer via email email DATE 7/7/2020 7/8/2020 OFFICIAL RECORD COPY