BWXT Nuclear Operations Group - Calendar Year 2021 Inspection Schedule Letter
ML20189A262
Person / Time
Site: BWX Technologies
Issue date: 07/02/2020
From: Suzanne Dennis
NRC/RGN-III
To: Burch B
BWXT
References
Download: ML20189A262 (5)


Text

July 2, 2020 Mr. B. Joel Burch Vice President and General Manager BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

BWXT NUCLEAR OPERATIONS GROUP - CALENDAR YEAR 2021 INSPECTION SCHEDULE

Dear Mr. Burch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the BWXT Nuclear Operations Group, Inc. (NOG) facility for calendar year 2021. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Noel Pitoniak at (404) 997-4634 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

B. Burch 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Suzanne K. Dennis, Acting Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-27 License No. SNM-42

Enclosure:

BWXT Nuclear Operations Group - Calendar Year 2021 Inspection Schedule (See page 2) cc: w/ encl: Distribution via LISTSERV

ML20189A262 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI NAME N. Pitoniak S. Dennis DATE 07/2/2020 07/6/2020 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO BWXT NUCLEAR OPERATIONS GROUP -

CALENDAR YEAR 2021 INSPECTION SCHEDULE NCS1 Dates January 25 - 29, 2021 Number of Inspectors 2 Inspection Procedure (IP) 88015 - Nuclear Criticality Safety MC&A1 Dates February 1 - 5, 2021 Number of Inspectors 2 85207, 85209, 85211, 85303, 85305, 85307, 85309, Inspection Procedures (IPs) 85311, 85313, 85315, 85407, 85408 PHYSEC (HQ FOF)

February 22 - 26, 2021 Dates March 22 - 26, 2021 Number of Inspectors TBD Inspection Procedure (IP) 96001 OPS1 Dates April 19 - 23, 2021 Number of Inspectors 2 Inspection Procedure (IP) 88020 - Operational Safety PHYSEC Dates May 17 - 21, 2021 Number of Inspectors 1 Inspection Procedures (IPs) 81700.08, 81820 PHYSEC Dates July 12, 2021 to July 16, 2021 Number of Inspectors 2 Inspection Procedure (IP) 81700.02 MC&A2 Dates July 19 - 23, 2021 Number of Inspectors 2 85207, 85209, 85211, 85303, 85305, 85307, 85309, Inspection Procedures (IPs) 85311, 85313, 85315, 85407, 85408 Enclosure

NCS2 Dates July 26 - 30, 2021 Number of Inspectors 2 Inspection Procedure (IP) 88015 - Nuclear Criticality Safety PMT Dates September 20 - 24, 2021 Number of Inspectors 3 Inspection Procedure (IP) 88072 - Permanent Plant Modifications (Triennial)

PHYSEC Dates October 18 - 22, 2021 Number of Inspectors 2 Inspection Procedure (IP) 81700.04 EPX Dates October 25 - 29, 2021 (Placeholder)

Number of Inspectors 3 Inspection Procedure (IP) 88051 - Emergency Preparedness Exercise OPS2 Dates November 1 - 5, 2021 Number of Inspectors 2 Inspection Procedure (IP) 88020 - Operational Safety ENV/RP Dates December 6 - 10, 2021 Number of Inspectors 2 88030 - Radiation Protection Inspection Procedure (IP) 88045 - Effluent Control and Environmental Protection 2