PMNS20200717, Partially Closed Meeting with Holtec International (Holtec) and the Nuclear Regulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems
ML20181A436 | |
Person / Time | |
---|---|
Issue date: | 06/29/2020 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20200717 | |
Download: ML20181A436 (3) | |
Similar Documents from Office of Nuclear Reactor Regulation | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20250309, Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-03-0808 March 2025
[Table view]Some use of "" in your query was not closed by a matching "".Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250266, Closed Meeting Regarding a Planned pre-submittal LAR for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-03-0808 March 2025 Closed Meeting Regarding a Planned pre-submittal LAR for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250253, March 10, 2025, NRC Public Meeting Between the Office of Nuclear Reactor Regulation (NRR) Management and the Pressurized Water Reactor Owners Group (PWROG) Executive Committee at the North Bethesda Marriott2025-03-0707 March 2025 March 10, 2025, NRC Public Meeting Between the Office of Nuclear Reactor Regulation (NRR) Management and the Pressurized Water Reactor Owners Group (PWROG) Executive Committee at the North Bethesda Marriott PMNS20250262, Advance Act (Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024): Mission Statement Implementation Guidance2025-03-0707 March 2025 Advance Act (Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024): Mission Statement Implementation Guidance PMNS20250291, Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-0606 March 2025 Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20250301, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 22025-03-0606 March 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 2 PMNS20250280, Notice of Meeting with Nextera Energy Duane Arnold, LLC2025-03-0505 March 2025 Notice of Meeting with Nextera Energy Duane Arnold, LLC PMNS20250283, Notice of Meeting with Constellation Energy Generation, LLC2025-03-0505 March 2025 Notice of Meeting with Constellation Energy Generation, LLC PMNS20250287, Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC)2025-03-0404 March 2025 Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Sta PMNS20250003, Public Meeting Between U.S. Nuclear Regulatory Commission and Nuclear Energy Institute Regarding ASME Code Case N-883: Construction of Items Prior to the Establishment of a Section III, Division 1, Owner2025-03-0404 March 2025 Public Meeting Between U.S. Nuclear Regulatory Commission and Nuclear Energy Institute Regarding ASME Code Case N-883: Construction of Items Prior to the Establishment of a Section III, Division 1, Owner PMNS20250213, Closed Meeting Regarding a Planned Revision to the Nuclear Criticality Safety Analysis for Fuel Storage at Salem Nuclear Generating Station2025-03-0303 March 2025 Closed Meeting Regarding a Planned Revision to the Nuclear Criticality Safety Analysis for Fuel Storage at Salem Nuclear Generating Station PMNS20250275, Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-02-28028 February 2025 Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250276, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption2025-02-28028 February 2025 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption PMNS20250274, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption2025-02-28028 February 2025 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption PMNS20250269, Public Preapplication Meeting for Susquehanna Steam Electric Station, Units 1 and 2, Planned License Amendment Request for Change to Technical Specifications2025-02-27027 February 2025 Public Preapplication Meeting for Susquehanna Steam Electric Station, Units 1 and 2, Planned License Amendment Request for Change to Technical Specifications PMNS20250264, Reactor Oversight Process Public Meeting2025-02-25025 February 2025 Reactor Oversight Process Public Meeting PMNS20250126, Meeting with Vistra Operations Company LLC to Discuss Comanche Peak Nuclear Power Plant, Unit No. 1 Alternative Request RV-1A2025-02-24024 February 2025 Meeting with Vistra Operations Company LLC to Discuss Comanche Peak Nuclear Power Plant, Unit No. 1 Alternative Request RV-1A PMNS20250215, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Planned License Amendment for LaSalle County Station, Units No. 1 and 2 (LaSalle) Related to the Power Range Neutron Monitor (Prnm)2025-02-24024 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Planned License Amendment for LaSalle County Station, Units No. 1 and 2 (LaSalle) Related to the Power Range Neutron Monitor (Prnm) PMNS20250219, 3/5 - U.S. Nuclear Regulatory Commission (NRC) and Industry 10 CFR 50.69 Public Workshop2025-02-22022 February 2025 3/5 - U.S. Nuclear Regulatory Commission (NRC) and Industry 10 CFR 50.69 Public Workshop PMNS20250250, Meeting with Rensselaer Polytechnic Institute (RPI) to Discuss Potential Licensing Action2025-02-21021 February 2025 Meeting with Rensselaer Polytechnic Institute (RPI) to Discuss Potential Licensing Action PMNS20250247, Proposed Use of Offsite Meteorological Data for Safety Reviews and Atmospheric Dispersion Modeling, Advancenrc2025-02-18018 February 2025 Proposed Use of Offsite Meteorological Data for Safety Reviews and Atmospheric Dispersion Modeling, Advancenrc PMNS20250130, Microreactor Licensing and Deployment Considerations Workshop2025-02-18018 February 2025 Microreactor Licensing and Deployment Considerations Workshop ML25045A1952025-02-14014 February 2025 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Transition to a New Type of Westinghouse Fuel for the Callaway Plant, Unit No. 1 PMNS20250153, Notice of Meeting with Constellation Energy Generation, LLC2025-02-14014 February 2025 Notice of Meeting with Constellation Energy Generation, LLC PMNS20250243, Advanced Reactor Stakeholder Meeting2025-02-14014 February 2025 Advanced Reactor Stakeholder Meeting PMNS20250229, Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor2025-02-13013 February 2025 Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor PMNS20250220, Status of Activities to Support Planned Power Uprate at Salem Nuclear Generating Station2025-02-13013 February 2025 Status of Activities to Support Planned Power Uprate at Salem Nuclear Generating Station PMNS20250235, Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC)2025-02-13013 February 2025 Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Sta PMNS20250222, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 22025-02-13013 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 2 PMNS20241528, Advanced Reactors Stakeholder Meeting2025-02-12012 February 2025 Advanced Reactors Stakeholder Meeting PMNS20250218, Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-02-12012 February 2025 Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20250148, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2, (Quad Cities) to Apply a Risk Informed Completion Time (RICT)2025-02-0303 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2, (Quad Cities) to Apply a Risk Informed Completion Time (RICT) PMNS20250150, Pre-application Meeting for Monticello Emergency Plan Change2025-02-0303 February 2025 Pre-application Meeting for Monticello Emergency Plan Change PMNS20250074, Pre-Application Public Meeting for Subsequent License Renewal Application - H.B. Robinson Steam Electric Plant, Unit 22025-01-31031 January 2025 Pre-Application Public Meeting for Subsequent License Renewal Application - H.B. Robinson Steam Electric Plant, Unit 2 PMNS20250143, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32025-01-31031 January 2025 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 ML25030A2542025-01-30030 January 2025 Teleconference with Union Electric Company to Discuss Supplemental Information Needed for the Proposed Alternatives to Certain ASME Code, Section XI, Requirements for Callaway Plant, Unit No. 1 PMNS20250132, Forthcoming Public Meeting with the National Organization of Test, Research and Training Reactors2025-01-29029 January 2025 Forthcoming Public Meeting with the National Organization of Test, Research and Training Reactors PMNS20250038, U.S. NRC and Trtr Public Workshop on Implementation of the NPUF Rule2025-01-29029 January 2025 U.S. NRC and Trtr Public Workshop on Implementation of the NPUF Rule PMNS20250122, Public Meeting to Discuss Nuclear Energy Institutes (Neis) Comments on Advance Act Section 507 - Improving Oversight and Inspection Programs to Promote Timely Acceptance of Digital Technologies2025-01-28028 January 2025 Public Meeting to Discuss Nuclear Energy Institutes (Neis) Comments on Advance Act Section 507 - Improving Oversight and Inspection Programs to Promote Timely Acceptance of Digital Technologies PMNS20241535, Reactor Oversight Process Public Meeting2025-01-28028 January 2025 Reactor Oversight Process Public Meeting ML25027A3702025-01-27027 January 2025 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force PMNS20250070, Meeting with Tennessee Valley Authority to Discuss Changes to Organization and Impacts on the Nuclear Quality Assurance Program Under Review2025-01-27027 January 2025 Meeting with Tennessee Valley Authority to Discuss Changes to Organization and Impacts on the Nuclear Quality Assurance Program Under Review PMNS20250079, NRC Meeting with Industry Steam Generator Task Force2025-01-24024 January 2025 NRC Meeting with Industry Steam Generator Task Force ML25023A1572025-01-23023 January 2025 Teleconference with Union Electric Company to Discuss Supplemental Information Needed for the Proposed Alternatives to Certain ASME Code, Section XI, Requirements for Callaway Plant, Unit No. 1 PMNS20241543, Meeting with Entergy Operations, Inc. of Proposed Alternative Examination of Steam Generator Welds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LLR-0038)2025-01-23023 January 2025 Meeting with Entergy Operations, Inc. of Proposed Alternative Examination of Steam Generator Welds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LLR-0038) PMNS20250044, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 22025-01-22022 January 2025 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 PMNS20250073, Public Meeting on the Draft Standardization Recommendations for License Renewal Applications2025-01-22022 January 2025 Public Meeting on the Draft Standardization Recommendations for License Renewal Applications PMNS20250012, Public Meeting to Discuss Advance Act Section 505 - Nuclear Licensing Efficiency2025-01-22022 January 2025 Public Meeting to Discuss Advance Act Section 505 - Nuclear Licensing Efficiency PMNS20241355, Annual Industry / U.S. Nuclear Regulatory Commission Nondestructive Examination (NDE) Technical Information Exchange Public Meeting2025-01-21021 January 2025 Annual Industry / U.S. Nuclear Regulatory Commission Nondestructive Examination (NDE) Technical Information Exchange Public Meeting PMNS20250061, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review2025-01-21021 January 2025 Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review 2025-03-08 Category:Meeting Agenda MONTHYEARPMNS20250266, Closed Meeting Regarding a Planned pre-submittal LAR for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-03-0808 March 2025
[Table view]Some use of "" in your query was not closed by a matching "".Closed Meeting Regarding a Planned pre-submittal LAR for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250309, Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-03-0808 March 2025 Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250253, March 10, 2025, NRC Public Meeting Between the Office of Nuclear Reactor Regulation (NRR) Management and the Pressurized Water Reactor Owners Group (PWROG) Executive Committee at the North Bethesda Marriott2025-03-0707 March 2025 March 10, 2025, NRC Public Meeting Between the Office of Nuclear Reactor Regulation (NRR) Management and the Pressurized Water Reactor Owners Group (PWROG) Executive Committee at the North Bethesda Marriott PMNS20250262, Advance Act (Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024): Mission Statement Implementation Guidance2025-03-0707 March 2025 Advance Act (Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024): Mission Statement Implementation Guidance PMNS20250301, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 22025-03-0606 March 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 2 PMNS20250291, Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-0606 March 2025 Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20250280, Notice of Meeting with Nextera Energy Duane Arnold, LLC2025-03-0505 March 2025 Notice of Meeting with Nextera Energy Duane Arnold, LLC PMNS20250283, Notice of Meeting with Constellation Energy Generation, LLC2025-03-0505 March 2025 Notice of Meeting with Constellation Energy Generation, LLC PMNS20250003, Public Meeting Between U.S. Nuclear Regulatory Commission and Nuclear Energy Institute Regarding ASME Code Case N-883: Construction of Items Prior to the Establishment of a Section III, Division 1, Owner2025-03-0404 March 2025 Public Meeting Between U.S. Nuclear Regulatory Commission and Nuclear Energy Institute Regarding ASME Code Case N-883: Construction of Items Prior to the Establishment of a Section III, Division 1, Owner PMNS20250287, Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC)2025-03-0404 March 2025 Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Sta PMNS20250213, Closed Meeting Regarding a Planned Revision to the Nuclear Criticality Safety Analysis for Fuel Storage at Salem Nuclear Generating Station2025-03-0303 March 2025 Closed Meeting Regarding a Planned Revision to the Nuclear Criticality Safety Analysis for Fuel Storage at Salem Nuclear Generating Station PMNS20250275, Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.22025-02-28028 February 2025 Closed Meeting Regarding a Planned pre-submittal License Amendment Request for Proposed Changes to the Seabrook Unit 1 Emergency Action Level HU4.2 PMNS20250276, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption2025-02-28028 February 2025 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption PMNS20250274, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption2025-02-28028 February 2025 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemption PMNS20250269, Public Preapplication Meeting for Susquehanna Steam Electric Station, Units 1 and 2, Planned License Amendment Request for Change to Technical Specifications2025-02-27027 February 2025 Public Preapplication Meeting for Susquehanna Steam Electric Station, Units 1 and 2, Planned License Amendment Request for Change to Technical Specifications PMNS20250264, Reactor Oversight Process Public Meeting2025-02-25025 February 2025 Reactor Oversight Process Public Meeting PMNS20250215, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Planned License Amendment for LaSalle County Station, Units No. 1 and 2 (LaSalle) Related to the Power Range Neutron Monitor (Prnm)2025-02-24024 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Planned License Amendment for LaSalle County Station, Units No. 1 and 2 (LaSalle) Related to the Power Range Neutron Monitor (Prnm) PMNS20250126, Meeting with Vistra Operations Company LLC to Discuss Comanche Peak Nuclear Power Plant, Unit No. 1 Alternative Request RV-1A2025-02-24024 February 2025 Meeting with Vistra Operations Company LLC to Discuss Comanche Peak Nuclear Power Plant, Unit No. 1 Alternative Request RV-1A PMNS20250219, 3/5 - U.S. Nuclear Regulatory Commission (NRC) and Industry 10 CFR 50.69 Public Workshop2025-02-22022 February 2025 3/5 - U.S. Nuclear Regulatory Commission (NRC) and Industry 10 CFR 50.69 Public Workshop PMNS20250250, Meeting with Rensselaer Polytechnic Institute (RPI) to Discuss Potential Licensing Action2025-02-21021 February 2025 Meeting with Rensselaer Polytechnic Institute (RPI) to Discuss Potential Licensing Action PMNS20250247, Proposed Use of Offsite Meteorological Data for Safety Reviews and Atmospheric Dispersion Modeling, Advancenrc2025-02-18018 February 2025 Proposed Use of Offsite Meteorological Data for Safety Reviews and Atmospheric Dispersion Modeling, Advancenrc PMNS20250130, Microreactor Licensing and Deployment Considerations Workshop2025-02-18018 February 2025 Microreactor Licensing and Deployment Considerations Workshop PMNS20250153, Notice of Meeting with Constellation Energy Generation, LLC2025-02-14014 February 2025 Notice of Meeting with Constellation Energy Generation, LLC ML25045A1952025-02-14014 February 2025 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Transition to a New Type of Westinghouse Fuel for the Callaway Plant, Unit No. 1 PMNS20250243, Advanced Reactor Stakeholder Meeting2025-02-14014 February 2025 Advanced Reactor Stakeholder Meeting PMNS20250222, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 22025-02-13013 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding the Digital Modernization License Amendment Request (LAR) for Limerick Generating Station, Units 1 and 2 PMNS20250220, Status of Activities to Support Planned Power Uprate at Salem Nuclear Generating Station2025-02-13013 February 2025 Status of Activities to Support Planned Power Uprate at Salem Nuclear Generating Station PMNS20250235, Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC)2025-02-13013 February 2025 Meeting to Discuss Sections of the National Organization of Test, Research and Training Reactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications (NEI 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Sta PMNS20250229, Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor2025-02-13013 February 2025 Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor PMNS20241528, Advanced Reactors Stakeholder Meeting2025-02-12012 February 2025 Advanced Reactors Stakeholder Meeting PMNS20250218, Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-02-12012 February 2025 Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20250150, Pre-application Meeting for Monticello Emergency Plan Change2025-02-0303 February 2025 Pre-application Meeting for Monticello Emergency Plan Change PMNS20250148, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2, (Quad Cities) to Apply a Risk Informed Completion Time (RICT)2025-02-0303 February 2025 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2, (Quad Cities) to Apply a Risk Informed Completion Time (RICT) PMNS20250143, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32025-01-31031 January 2025 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20250074, Pre-Application Public Meeting for Subsequent License Renewal Application - H.B. Robinson Steam Electric Plant, Unit 22025-01-31031 January 2025 Pre-Application Public Meeting for Subsequent License Renewal Application - H.B. Robinson Steam Electric Plant, Unit 2 ML25030A2542025-01-30030 January 2025 Teleconference with Union Electric Company to Discuss Supplemental Information Needed for the Proposed Alternatives to Certain ASME Code, Section XI, Requirements for Callaway Plant, Unit No. 1 PMNS20250132, Forthcoming Public Meeting with the National Organization of Test, Research and Training Reactors2025-01-29029 January 2025 Forthcoming Public Meeting with the National Organization of Test, Research and Training Reactors PMNS20250038, U.S. NRC and Trtr Public Workshop on Implementation of the NPUF Rule2025-01-29029 January 2025 U.S. NRC and Trtr Public Workshop on Implementation of the NPUF Rule PMNS20241535, Reactor Oversight Process Public Meeting2025-01-28028 January 2025 Reactor Oversight Process Public Meeting PMNS20250122, Public Meeting to Discuss Nuclear Energy Institutes (Neis) Comments on Advance Act Section 507 - Improving Oversight and Inspection Programs to Promote Timely Acceptance of Digital Technologies2025-01-28028 January 2025 Public Meeting to Discuss Nuclear Energy Institutes (Neis) Comments on Advance Act Section 507 - Improving Oversight and Inspection Programs to Promote Timely Acceptance of Digital Technologies ML25027A3702025-01-27027 January 2025 Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force PMNS20250070, Meeting with Tennessee Valley Authority to Discuss Changes to Organization and Impacts on the Nuclear Quality Assurance Program Under Review2025-01-27027 January 2025 Meeting with Tennessee Valley Authority to Discuss Changes to Organization and Impacts on the Nuclear Quality Assurance Program Under Review PMNS20250079, NRC Meeting with Industry Steam Generator Task Force2025-01-24024 January 2025 NRC Meeting with Industry Steam Generator Task Force PMNS20241543, Meeting with Entergy Operations, Inc. of Proposed Alternative Examination of Steam Generator Welds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LLR-0038)2025-01-23023 January 2025 Meeting with Entergy Operations, Inc. of Proposed Alternative Examination of Steam Generator Welds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LLR-0038) ML25023A1572025-01-23023 January 2025 Teleconference with Union Electric Company to Discuss Supplemental Information Needed for the Proposed Alternatives to Certain ASME Code, Section XI, Requirements for Callaway Plant, Unit No. 1 PMNS20250044, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 22025-01-22022 January 2025 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 PMNS20250012, Public Meeting to Discuss Advance Act Section 505 - Nuclear Licensing Efficiency2025-01-22022 January 2025 Public Meeting to Discuss Advance Act Section 505 - Nuclear Licensing Efficiency PMNS20250073, Public Meeting on the Draft Standardization Recommendations for License Renewal Applications2025-01-22022 January 2025 Public Meeting on the Draft Standardization Recommendations for License Renewal Applications PMNS20250061, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review2025-01-21021 January 2025 Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent License Renewal Review PMNS20241355, Annual Industry / U.S. Nuclear Regulatory Commission Nondestructive Examination (NDE) Technical Information Exchange Public Meeting2025-01-21021 January 2025 Annual Industry / U.S. Nuclear Regulatory Commission Nondestructive Examination (NDE) Technical Information Exchange Public Meeting 2025-03-08 |
Text
June 29, 2020
Title:
Partially Closed Meeting with Holtec International (Holtec) and the Nuclear Regulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems July 17, 2020, 10:30 AM to 12:30 PM Date(s) and Time(s):
Location:
Teleconference Category:
This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.
Purpose:
The Purpose of this Meeting is for NRC staff to discuss the review process and schedule for Topical Report (TR) for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems review, and for Holtec to provide an overview of the TR.
Contact:
Ngola Otto 301-415-6695 Ngola.Otto@nrc.gov NRC Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation
Participants:
External Holtec International Teleconference:
Bridge Number Pass Code (301) 415-0333 538250
PUBLIC MEETING AGENDA
Partially Closed Meeting with Holtec International (Holtec) and the Nuclear Regulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems July 17, 2020, 10:30 AM to 12:30 PM Teleconference
The time of the meeting is local to the jurisdiction where the meeting is being held.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
ADAMS Accession Number: ML20181A436 Distribution:
Name Dennis Morey Office NRR Date 06/29/2020 OFFICIAL RECORD COPY https://www.nrc.gov/pmns/mtg?do=details&Code=20200717 Link to meeting details:
Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html