ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 1 of 6 Page Line Now Reads Should Read Speaker 2

11 Jon Christinidis, Esq.

Jon P. Christinidis, Esq.

N/A 4

12 at that Ryerson 4

13 as has Ryerson 6

2 that might than might Ryerson 8

22 respondent responding Matthews 9

8 Francis Frances Woods 10 16-17 walk-dogging watch-dogging Collins 10 19 Hedwid Hedwig Collins 10 20 Prince Township Frenchtown Township Collins 12 1

MO ML Sherman 12 4

circulation.

circulation loss.

Sherman 12 7-8 these materials at the these aging materials as the Sherman 12 10 always already Sherman 12 14 the panels the snap in panels Sherman 12 24 the front loads the drop loads Sherman 13 2

incinerator diesel generator Sherman 13 4

could be an issue by could be initiated by Sherman 13 8

scenario. Decreased scenario, and decreased Sherman 13 10 (Telephonic interference)

Degraded NAMs Sherman 13 12 cause filters to block clog filters and block Sherman 13-14 25-1 Just a few years later the Two years later NERC found the Sherman 14 1-2 violation. Writing of violation, writing:

Sherman 14 2

were incomplete were: Incomplete Sherman 14 3

records where records; Running Sherman

ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 2 of 6 Page Line Now Reads Should Read Speaker 14 4

systems testing was ineffective. A systems to track testing were both ineffective; A Sherman 14 5

records failed to records; A failure to Sherman 14 7-8 and a failure to understand ethical standards in the environment.

and A failure to understand applicable standards and requirements.

Sherman 14 10 analysis' conclusion analysis leading to the conclusion Sherman 15 4

degradation of the dam degradation of the NAM Deer In Water 15 14 whether uncredited or not whether accredited or not Deer In Water 15 21 areal density areal Boron10 density Deer In Water 16 11-12 movement in storage to fuel movement and storage of fuel Deer In Water 16 18 filters in the filters, and the Deer In Water 17 5

the ponds (phonetic) were the coupons were Deer In Water 17 14 mess with - -

mess with the movement of rods Deer In Water 18 4

and (telephonic interference) and the inserts Deer In Water 19 18 Now each Notably, each Lighty 20 7

and an Lighty 20 10 LAR to be gleaned LAR could be gleaned Lighty 20 23 function, but more function, more Lighty 21 7

So Petitioner's overarching theory, it is Thus, Petitioner's overarching theory is Lighty 21 25 Francis Frances Woods 22 6

propose admissible propose an admissible Woods

ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 3 of 6 Page Line Now Reads Should Read Speaker 22 16 left less Woods 22 24 and both in both Woods 23 23 inserts. All inserts, all Woods 24 11 spent fuel and a spent fuel pool spent fuel in a spent fuel pool Woods 24 16 of presumption presumption Woods 25 9

proceeding proceedings Woods 26 8-9 spent fuel and the spent fuel pool enduring spent fuel in the spent fuel pool and during Woods 28 5

margins margin Woods 28 8

supposed to be challenged proposed to be changed Woods 28 14 it does challenge it does not challenge Woods 28 15 licensing license Woods 31 2

Francis Frances Mertz 31 8

ISFSI construction to ISFSI construction and to Mertz 32 2

pools remain pool remains Mertz 32 3

text, test Mertz 32 14-15 their source partners' decision Interim Storage Partners decisions Mertz 32 16 background that ground Mertz 33 22 set aside demonstrate Wachutka 34 11 those of those are Wachutka 35 16 completing conflating Ryerson 35 17 establishing standard establishing standing Ryerson 37 15 precedence precedents Wachutka

ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 4 of 6 Page Line Now Reads Should Read Speaker 39 11 their other two independent ACs our other two independent bases Wachutka 39 20 filing filings Wachutka 40 23 International Interim International and Interim Woods 41 18 or their or the Wachutka 44 19 unusable, discontinued due to unusable, due to Deer In Water 44 22-23 really think of scenarios --

really give you any scenarios because Deer In Water 44 25 is steadily irradiated by gets heavily irradiated by Deer In Water 45 1

gamma irradiated by and essentially gamma radiation and potentially Deer In Water 45 14 enough unknown and of known unknowns enough knowns and unknown knowns Sherman 45 15-16 and if this didn't rest and that this shouldn't rest Sherman 45 20 SUNI SUNSI Collins 46 9

been on been no Lighty 46 16 speculations contradict speculation contradicts Lighty 47 21 MR. WACHUTKA MR. SHERMAN N/A 49 12 Applicants Applicant's Arnold 49 13 Analysis Analyses Arnold 49 22-23 Boraflex there and shoving more debris and stuff in it, the criticality, Boraflex there and shoving more debris stuff in it, that's what the criticality, Collins 50 8

end and Arnold 51 23 4

6 Collins

ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 5 of 6 Page Line Now Reads Should Read Speaker 51-52 25-1 know that answer.

know the answer.

Collins 52 11 graded degraded Sherman 52 19 exasperating exacerbated Sherman 52 22 and changing the

, in changes in Sherman 52 23 marking.

margin.

Sherman 53 5

discussion discussing Arnold 54 7

it's not a this is not even a Deer In Water 55 15 0.95K Effective 0.95 K effective Lighty 55 19 1.5 and above 1.0 and above Lighty 56-57 25-1 Shutdown is Is Arnold 57 2

such than such that Arnold 57 5

energy NRC Wachutka 57 9

10 CFR 50.6(a) 10 CFR 50.68 Wachutka 57 15 roll so Wachutka 58 8

GTE DTE Lighty 58 14 specifically that the specifically the Lighty 58 16 must not be challenged have not been challenged Lighty 59 8

MS. WOODS:

(UNKNOWN SPEAKER):

N/A 59 10 MS. WOODS:

(UNKNOWN SPEAKER):

N/A 59 23-24 that's been determined with CRAFT

, it's Jim Sherman with

CRAFT, Sherman 59 25 GTE DTE Sherman 60 13 a bid has to look they should look Sherman 61 19 learn from see from Sherman 62 2

really be specific really specifically Deer In Water 62 5

going to do that going to create, react--

Deer In Water

ATTACHMENT - OFFICIAL TRANSCRIPT ERRATA SHEET In the Matter of DTE Electric Company (Fermi 2)

Docket No. 50-341-LA June 10, 2020 Oral Argument Page 6 of 6 Page Line Now Reads Should Read Speaker 62 7

DE DTE Deer In Water 62 11 want (telephonic interference) want it necessarily to be dissected Deer In Water 63 17 iterate reiterate Woods 64 10 contention and admissibility contention admissibility Ryerson 65 9

contention, admissibility contention admissibility Ryerson