ML20174A398
| ML20174A398 | |
| Person / Time | |
|---|---|
| Site: | Holtec |
| Issue date: | 06/22/2020 |
| From: | Tomlinson J Holtec |
| To: | Yen-Ju Chen Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML20174A397 | List: |
| References | |
| 5014902 | |
| Download: ML20174A398 (2) | |
Text
HOLTEC INTERNATIONAL June 22, 2020 Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Yen-Ju Chen Sr. Project Manager-Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1014, Certificate of Compliance (CoC) No. 1014
Subject:
Submittal of Response to RAI 4-9 for HI-STORM 100 Amendment Number 15 Reference(s): [1] "Amendment No. 15 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information" (Letter from Yen-Ju Chen (NRC) to Joyce Tomlinson (Holtec) dated March 6, 2020)
Dear Ms. Chen:
By letter dated March 6, 2020 [1 ], NRC staff requested additional information (RAis) needed to complete their detailed technical review of HI-STORM 100 Amendment 15 to the Certificate of Compliance No. 1014. Holtec provided responses for several of the RAis on April 28, 2020 and stated that the response to RAI 4-9 would be provided by June 22, 2020. This letter submits the response to RAI 4-9 and supplemental information to the response to RAI 8-1. to this letter contains the response to RAI 4-9 and supplemental information to RAI 8-1 in a proprietary version. Attachment 2 contains the response in a non-proprietary version. provides the affected FSAR changed pages, with the changes specific to RAI 4-9 response highlighted in yellow. Attachments 4 and 5 contain the technical information used to support the response to RAI 4-9. Holtec considers information in Attachments I, 4 and 5 to be proprietary information; therefore, Attachment 6 to this letter is an affidavit prepared in accordance with 10 CFR 2.390 requesting that Attachments I, 4 and 5 be withheld from public disclosure.
If you have any questions, please contact me at 856-797-0900 ext. 3765.
Document ID 5014902 Page I of2
I Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 H Q LT E C:
Fax (856) 797-0909 INTERN AT IO N AL_
Sincerely, Joyce Tomlinson Adjunct Licensing Manager, Holtec International cc:
(via email)
Attachments:
Attachment l: Response to Request for Additional Information to RAI 4-9 and RAI 8-1 for HI-STORM l 00 LAR l O 14-15 response. (proprietary) : Response to Requests for Supplemental Information to RAI 4-9 and RAI 8-1 for HI-STORM 100 LAR 1014-15 response. (non-proprietary) : HI-STORM 100 FSAR Proposed Changed pages (Proposed Rev. 17.C) (non-proprietary) : HI-2043317 rev 41, "HJ-STORM Thermal-Hydraulic Analysis Supporting Upto 36.9 kW High Heat Load" Appendix R (proprietary) : Thermal Calculations Package Input/ Output files (proprietary) : Affidavit Pursuant to l O CFR 2.390 to Withhold Information from Public Disclosure (non-proprietary)
Document ID 5014902 Page 2 of2