MONTHYEARML20168A7302020-06-16016 June 2020 Final ASP Analysis - Salem 1 (LER 272-79-068) ML20168A7282020-06-16016 June 2020 Final ASP Analysis - Salem 1 (LER 272-77-034) ML20156A2132020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-85-018) ML20156A2122020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-83-041) ML20156A2112020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-83-001) ML20156A2102020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-82-126) ML20156A2092020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-84-017) ML20156A2082020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-83-033) ML20156A2062020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-069) ML20156A2052020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-053) ML20156A2042020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-041) ML20135H3212020-05-14014 May 2020 Final ASP Analysis - Salem 2 (LER 311-90-042) ML20135H3202020-05-14014 May 2020 Final ASP Analysis - Salem 2 (LER 311-90-005) ML20135H3192020-05-14014 May 2020 Final ASP Analysis - Salem 1 and 2 (LER 272-96-002) ML20135H3182020-05-14014 May 2020 Final ASP Analysis - Salem 1 (LER 272-91-030) IR 05000311/19990102020-05-12012 May 2020 Final ASP Analysis - Salem 2 (IR 050003111999010) 2020-06-04
[Table view] Category:Final
MONTHYEARML20168A7302020-06-16016 June 2020 Final ASP Analysis - Salem 1 (LER 272-79-068) ML20168A7282020-06-16016 June 2020 Final ASP Analysis - Salem 1 (LER 272-77-034) ML20156A2132020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-85-018) ML20156A2122020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-83-041) ML20156A2112020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-83-001) ML20156A2102020-06-0404 June 2020 Final ASP Analysis - Salem 2 (LER 311-82-126) ML20156A2092020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-84-017) ML20156A2082020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-83-033) ML20156A2062020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-069) ML20156A2052020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-053) ML20156A2042020-06-0404 June 2020 Final ASP Analysis - Salem 1 (LER 272-82-041) ML20135H3212020-05-14014 May 2020 Final ASP Analysis - Salem 2 (LER 311-90-042) ML20135H3202020-05-14014 May 2020 Final ASP Analysis - Salem 2 (LER 311-90-005) ML20135H3192020-05-14014 May 2020 Final ASP Analysis - Salem 1 and 2 (LER 272-96-002) ML20135H3182020-05-14014 May 2020 Final ASP Analysis - Salem 1 (LER 272-91-030) IR 05000311/19990102020-05-12012 May 2020 Final ASP Analysis - Salem 2 (IR 050003111999010) 2020-06-04
[Table view] |
Text
20, 1977 oth SI Pumps and One Charging Pump Out of Service During Heatup at alem 1 re sequence was:
g plant heatup, both SI pumps plus one centrifugal charging pump were leared from cold shutdown overpressure control.
e action; verpressure control restrictions were cleared upon discovery.
rpose of failed system or component:
afety Injection pumps and the centrifugal charging pumps provide high safety injection during a small LOCA.
3 ility of system per WASH 140T:* High Pressure Injection: 8.6 x 10 -/D ility of component per WASH 1400:* operator error, failure to follow a step within a procedure: 3 x 10-3iD 1
vailabilitie are in units of per demand D- . Failure rates are in per hour HR-T
ctor heatup, Two of two safety One of two centri- Potential h reactor in injection pumips fugal charging Severe shutdown inoperable due to pumps inoperable Core failure to clear due to failure-to Damage cold shutdown over- clear cold shutdown pressure control overpressure control restrictions restrictions No -no LOCA plus in hot shutdown No -no LOCA plus in hot shutdown No NSIC 125106 - Actual Occurrence for Both SI Pumps and One Charging Pump Out of Service During Heatup Salem 1
Heat Removal tross-Connect Damage 1
2 3
4 5
6 7
NSIC 125106 - Sequence of Interest for Both SI Pumps and One Charging Pump Out of Service During Heatup at-Salem 1.
N NUMBER: 125106 May 20, 1977
- May 6, 1977 ED: Safety Injection, Charging OLVED: SI pumps, charging pump re to clear cold-shutdown overpressure control restrictions, human error.
NTEREST: Small LOCA ENCE: failure to clear overpressure restrictions during heatup Salem 1
- 50-272 PWR ICAL RATING: 1090 MWe 0.8 yr inghouse INEERS: Utility Public Service Electric & Gas Co.
0 miles south of Wilmington, DE 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> NG CONDITION: hot shutdown RE TYPE OF FAILURE: (a) inadequate performance;(Cb) failed to start; (9made inooerable; (d) -
HOD: plant equipment status review