B-587 PRECURSOR DESCRIPTION AND DATA NSIC Accession Number: 147399 Date: March 22, 1979

Title:

Both Diesel Generators Unavailable at Kewaunee The failure sequence was:

1. With the reactor at full power, diesel generator lB was removed from service for maintenance.
2. During the testing of diesel 1A, manual speed control was lost due to excessive wear to the bronze pinion in the syncho-notor gear housing.

The pinion damage was caused by improper gear alignment and failure of a governor limit switch.

Corrective action:

The pinion and limit switch were replaced and adjusted and the diesel generator was tested and returnr4 to service.

Design purpose of failed system or component:

The diesel generators provide power to safety-related equipment when offsite power and the unit generator are unavailable.

2 Unavailability of system per WASH 1400: *Emergency power: 1 x 10- 1D Unavailability of component per WASH 1400: *Diesel generator: 3 x 10-2 /D Unavailabilities are in units of per demand D-1. Failure rates are in units of per hour HR-1 .

Reactor at Power Diesel Generator Potential and Diesel Gen- lA Fails to Run Severe erator lB Removed Due to Loss of Core From Service for Manual Speed Damage Maintenance Control - A Result of a Worn Pinion in the Synchro-Motor Gear Housing and a Failed Limit Switch No - No loop td' No NSIC 147399 - Actual Occurrence for Both Diesel Generators Unavailable at Kewaunee

/

Loss of Turbine Emer- Auxiliary PORV PORV or High Long Potential Sequence Offsite Generator gency Feedwater and Demanded PORV Isola- Pressure Term Severe No.

Power Runs Back Power Secondary tion Valve Injection Core Core and Assumes Heat Removal Clo::,ure Cooling Damage House toads

_______________________________________No No 2 No 3 Yes 4 Yes 5 No 6 00 No 7 Yes 8 Yes 9 No 10 Yes 11

-LIU 12 13 NSIC 147399 - Sequence of Interest for Both Diesel Generators Unavailable at Kewaunee

  • Not included in operating procedures

B-590 CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER: 147399 DATE OF LER: March 22, 1979 DATE OF EVENT: February 21, 1979 SYSTEM INVOLVED: Emergency power COMPONENT INVOLVED: Diesel generator CAUSE: Excessive wear on pinion In synchro-gear motor housing plus failed limit switch SEQUENCE OF INTEREST: Loss of offsite power ACTUAL OCCURRENCE: Unavailability of two diesel generators while at power REACTOR NAME: Kewaunee DOCKET NUMBER: 305 REACTOR TYPE: PWR DESIGN ELECTRICAL RATING: 535 M~We REACTOR AGE: 5.0 yr VENDOR: Westinghouse ARCHITECT-ENGINEERS: Flour Power OPERATORS: Wisconsin Public Service Corp.

LOCATION: 27 miles East of Green Bay, Wisconsin DURATION: 4(a) hours PLANT OPERATING CONDITION: 100% power SAFETY FEATURE TYPE OF FAILURE: (a) inadequate perform nce; (b) failed to start; (c) made inoperable; failed to run DISCOVERY METHOD: Testing COMMENT: