Final ASP Analysis - Kewaunee (LER 305-75-020)
ML20168A563
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/16/2020
From: Christopher Hunter
NRC/RES/DRA/PRB
To:
Littlejohn J (301) 415-0428
References
LER 1975-020-00
Download: ML20168A563 (4)


Text

PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:

108078 Date:

November 14, 1975

Title:

Auxiliary Feedwater Pump Flows Restricted at Kewaunee The failure sequence was:

1. Resin beads were leaking from a mixed-bed demineralizer in the makeup water system and travelling to the condensate storage tank..-
2. During a unit startup, AFW pumps IA and lB suction strainers became clogged with resin beads, resulting in low pump flow.
3. The turbine-driven AFW pump (1C) suction strainer was also clogged, which resulted in low flow from that pump also.

Corrective action;

1. The condensate storage tank and the pump suction strainers were cleaned and returned to service.
2. At a later date the fine mesh strainers were to have been removed.

Design purpose of failed system or component:

1. The auxiliary feedwater pumps provide water to the steam generators for reactor cooling in the event the main feedwater system is not operable.

Unavailability of system per WASH 1400: lkauxiliary feedwater:

2.5 X 10-4 (start + 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />)

Unavailability of component per WASH 1400:

  • strainers not included pumps, failure to start:

1 x 10-3 /D pumps, failure to run:

3 x 10-5 /hr Unavailabiliries are in units Of per demand D-1.

Failure rates are in units of per hourHR-1.

Unit in Mixed-bed Reduced auxiliary Reduced auxiliary startup demineralizer feedwater flow feedwater flow operations leaking resin from IA and lB from 1C turbine-beads to con-motor-driven AFW driven ANW pumip densate storage pumps due to due to suction tank suction strainers strainer clogged I

clogged with resin Iwith resin Potential Severe Core Damage No -

Main feedwater pumps operable No No No NSIC 108078 -

Actual Occurrence for Auxiliary Feedwater Pump Flows Restricted at Kewaunee

ot Reactor Auxiliary P0W PR rHigh JLong Term IPotential Sequence Trip Feedwater and Demanded POV soa Pressure oeSvr o

.water Secondary tion Valve Injection Cooling Core Heat Removal Closure Damage No 1

No 2

Yes 3

Yes 4

No 5

No 6

110.

Yes Yes 7

No 9

No 10 L

-Yes11 (F)

Yes12 Yes 13 NSIC 108078 -Sequence of Interest for Auxiliary Feedwater Pump Flows Restricted at Kewaunee

  • not included in mitigation procedures

CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER:

108078 DATE OF LER:

November 14, 1975 DATE OF EVENT:

November 5, 1975 SYSTEM INVOLVED:

Auxiliary Feedwater COMPONENT INVOLVED:

AFW Pump Strainers CAUSE:

Strainers clogged with resin beads SEQUENCE OF INTEREST:

Loss of feedwater ACTUAL OCCURRENCE:

Inoperable AFW pumps during plant start-up REACTOR NAMtE:

Kewaunee DOCKET NUMBER:

50-305.

REACTOR TYPE:

PWR DESIGN ELECTRICAL RATING:

535 MWe REACTOR AGE:

1.9 yr VENDOR:

Westinghouse ARCHITECT-ENGINEERS:

Pioneer Services OPERATORS:

Wisconsin Public Service Corp.

LOCATION:

27 injnes east of Greenbay, Wisc.

DURATION:

36t0(a) hours PLANT OPERATING CONDITION:

Plant startup SAFETY FEATURE TYPE OF FAILURE:

(a) inadequate performance;, (b) failed to start; 0

made inoperable; (d) _______

DISCOVERY METROD: during operation COMMENT:

-