PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:

64600 Date:

June 30, 1971

Title:

Loss of Offsite Power at Indian Point.1 The failure sequence was:

1. Both sources of offsite power were supplied through a single substation transformer (the normal second transformer was out-of-service for inspection).
2. The transformer tripped due to an inadvertent relay actuation, resulting in a total loss of off-site power.
3. (S'ince no other failures were reported it is assumed the plant tripped and emergency feedwater was utilized for reactor cooling.)

Corrective action;-

1. Modified operating procedures to provide greater assurance that at least two feeders, provided from separate sources, will be available at all times.

Design purpose of failed system or component:

1. Provide electric power to plant components when unit generator is not in operation.

Unavailability of system per WASH 1400:*

2 10-5 /hr Unavailability of component per WASH 1400:*

Unavailabilities are in units of per demand D-1.

Failure rates are in units of per hour HR-1.

Loss of offsite Required emergency power jequipment1 Potential Severe Core Damage NSIC 64600 -

Actual Occurrence.f or Loss of Off site Power at Indian Point I (OperationsReport No. 17)

'Operations report does not specify systems utilized after the loss of power occurred beyond this statement.

a)

-4 J-J 0

-4 0

Q)

P

0) u

)

4.J0 w

m U) 00ý4 C0 0) to w-4 0

>4.

0)40 w

414 Q) U o 4-4 44 CO 4 0. -4 m~ 0) 0)

r4 P0 0

0) 0)

1-4

,.j 0

0.

Cd 40

-4~0 cn

-4 4.4 0) 0.

u0)

ý-4 z0

CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER:

64600 DATE OF LER:

June 30, 1971 (Operations Report No. 17)

DATE OF EVENT: December 26, 1970 SYSTEM INVOLVED:

Of f site ac power COMPONENT INVOLVED:

Transmission lines CAUSE:

Shutdown of Buchanan Substation SEQUENCE OF INTEREST:

Loss of Offsite Power ACTUAL OCCURRENCE:

Shutdown of Buchanan Station.

REACTOR NAMIE:

Indian Point 1 DOCKET NUMBER:

50-3 REACTOR TYPE:

PWR DESIGN ELECTRICAL RATING:

265 MWe REACTOR AGE:

9.0 yr VENDOR:

B&W ARCHITECT-ENGINEERS:

Consolidated Edison Co...

OPERATORS:

Consolidated Edison Co.

LOCATION: 3 iu41es&.SW..of Peekskill, NY DURATION:

N/A PLANT OPERATING CONDITION:

Unknown.

SAFETY FEATURE TYPE OF FAILURE:

(a) inadequate performance; b)failed to start; a

made inoperable; (d)

DISCOVERY METHOD: Operational event.

COMMENT: