MONTHYEARML20168A5542020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-76-088) ML20168A5572020-06-16016 June 2020 Final ASP Analysis - Hatch 2 (LER 366-79-059) ML20168A5552020-06-16016 June 2020 Final ASP Analysis - Hatch 2 (LER 366-79-045) ML20168A5532020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-75-062) ML20168A5522020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-74-LTR) ML20149K3752020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-069) ML20149K3502020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-011) ML20149K3522020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-088) ML20149K3532020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-83-090) ML20149K3562020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-85-018) ML20149K3572020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-87-011) ML20149K3582020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-88-018) ML20149K3592020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-081) ML20149K3602020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-084) ML20149K3612020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-095) ML20149K3622020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-042) ML20149K3762020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-084) ML20149K3792020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-88-017) ML20149K3492020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 320-80-069) ML20149K3512020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-070) ML20135G9642020-05-14014 May 2020 Final ASP Analysis - Hatch 2 (LER 366-90-001) ML20135G9632020-05-14014 May 2020 Final ASP Analysis - Hatch 1 (LER 321-91-001) 2020-06-16
[Table view] Category:Final
MONTHYEARML20168A5542020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-76-088) ML20168A5572020-06-16016 June 2020 Final ASP Analysis - Hatch 2 (LER 366-79-059) ML20168A5552020-06-16016 June 2020 Final ASP Analysis - Hatch 2 (LER 366-79-045) ML20168A5532020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-75-062) ML20168A5522020-06-16016 June 2020 Final ASP Analysis - Hatch 1 (LER 321-74-LTR) ML20149K3752020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-069) ML20149K3502020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-011) ML20149K3522020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-088) ML20149K3532020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-83-090) ML20149K3562020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-85-018) ML20149K3572020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-87-011) ML20149K3582020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-88-018) ML20149K3592020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-081) ML20149K3602020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-084) ML20149K3612020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-82-095) ML20149K3622020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-042) ML20149K3762020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-83-084) ML20149K3792020-05-28028 May 2020 Final ASP Analysis - Hatch 2 (LER 366-88-017) ML20149K3492020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 320-80-069) ML20149K3512020-05-28028 May 2020 Final ASP Analysis - Hatch 1 (LER 321-82-070) ML20135G9642020-05-14014 May 2020 Final ASP Analysis - Hatch 2 (LER 366-90-001) ML20135G9632020-05-14014 May 2020 Final ASP Analysis - Hatch 1 (LER 321-91-001) 2020-06-16
[Table view] |
Text
CIC and HPOI Isolate Following a Reactor Scram at Hatch 2 re sequence was:
g a MSIV fast closure test, the reactor tripped (as intended) due to closure.
and RCIC isolated due to a high AIP signal.
perators reset and manually started both systems.
e action:
P switch was out of specs and it was reset.
vestigation was initiated to discern the cause of the out-of-spec tion.
urpose of failed system ur component:
is designed to maintain water level control given a small Loca.
is designed to maintain water level control given a loss of feed-flow.
IPswitches are designed to send an isolation signal given a steamline break in the HPCI or RCIC system.
ility of system per WASH 1400:
- HPCI: 8.8 x*10-2 /D given Loca RCIC: 8.0 x 10 2 /D given Loca ility of component per WASH 1400:
- pressure switches: 10-4 /D vailabilities are in units of per demand D .Failure rates are in per hour HR-1 .
jthen Damage No No - Feedwater system, available as was the AD~S, LPCI/CS system No 150499 - Actual Occurrence of RCIC and HPCI Isolate Following a Reactor Scram at Hatch 2
Core Damage No Yes 2 No 3
&t Yes Yes 6 Yes7 150499 -Sequence of Interest for ROTC and HPCI Isolate Following a Reactor Scram at Hatch 2 ess requires the operator to reset HPCI and/or RCIC.
of feedwater is presumed.
CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS ACCESSION NUMBER: 150499
. OF LER: July 6, 1979 OF EVENT: June 28, 1979 EM INVOLVED: HPCI, RCIC PONENT INVOLVED: AP switches SE: unknown as of reporting date ENCE OF INTEREST: loss of feedwater flow AL OCCURRENCE: RCIC and HPCI isolate followingas reactor scram at Hatch 2 TOR NAMýE: Hatch 2 ET NUMBER: 50-366 TOR TYPE: BWR GN ELECTRICAL RATING: 784 Nwe TOR AGE: 1.0 yr OR: General Electric ITECT-ENGINEERS: Southern Services/Bechtel ATORS: Georgia Power TION: 11 miles N of Baxley, Georgia 36 ATION: 0(a) hours T OPERATING CONDITION: 0% power TY FEATURE TYPE OF FAILURE: (a) inadequate performance; (b) failed to start; (5made inopera ble; (d) ____________
OVERY METHOD: operational test ENT: -