Final ASP Analysis - Turkey Point 4 (LER 251-81-011)
ML20161A167
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/09/2020
From: Christopher Hunter
NRC/RES/DRA/PRB
To:
Littlejohn J (301) 415-0428
References
LER 1981-011-00
Download: ML20161A167 (4)


Text

PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:

169587 Date:

November 4, 1981

Title:

Safety Injection Path to RCS Obstructed at Turkey Point 4 The failure sequence was:

1.

At the beginning of a refueling outage and while conducting a routine periodic test during partial draining of the RCS, the flow path to the RCS associated with the boron injection tank (BIT) was found obstructed.

2.

The apparent cause of the obstruction was reduced temperature resulting from missing insulation in the vicinity of a 4-in. tee at the inlet to the BIT.

3.

As a result of the obstruction, the safety injection flow path from all high head safety injection pumps to the RCS cold legs were blocked.

A flow path to the hot legs was verified to be operable by establishing flow.

Corrective action:

1.

The flow path was reestablished by alternating pump operation and raising the thermostat setting for the related heat tracing.

Design purpose of failed system or component:

The safety injection system provides high-pressure replacement water to the RCS during a LOCA and steam line break.

This system also provides boron injection for steam break return to power considerations.

Potential Severe Core Damage No -

no requirement for safety injection No NSIC 169587 - Actual Occurrence for Safety Injection Path to RCS Obstructed at Turkey Point 4

Small Reactor Auxiliary High Low Pressure LOCA Trip Feedwater and Pressure Recirculation Secondary Injection and LPR/HPI Heat Removal Cross-Connect Potential Severe Core Damage Sequence No.

No I

Yes Yes 2

3 4

No Yes Yes Yes 5

6 7

NSIC 169587 -

Sequence of Interest for Safety Injection Path to RCS Obstructed at Turkey Point 4

CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER:

169587 LER NO.:

81-011 DATE OF LER:

November 4, 1981 DATE OF EVENT:

October 21, 1981 SYSTEM INVOLVED:

Safety injection COMPONENT INVOLVED:

4-in. piping tee CAUSE:

Boric acid solidification blocked tee SEQUENCE OF INTEREST:

LOCA ACTUAL OCCURRENCE:

Unavailability of high head safety injection paths REACTOR NAME:

Turkey Point 4 DOCKET NUMBER:

50-251 REACTOR TYPE:

PWR DESIGN ELECTRICAL RATING:

693 MWe REACTOR AGE:

8.4 years VENDOR:

Westinghouse ARCHITECT-ENGINEERS:

Bechtel OPERATORS:

Florida Power & Light LOCATION:

25 miles south of Miami, Florida DURATION:

360 h (estimated)

PLANT OPERATING CONDITION:

Entering refueling shutdown TYPE OF FAILURE:

Made inoperable DISCOVERY METHOD:

Testing COMMENT: