ML20160A137

From kanterella
Jump to navigation Jump to search
Jun 8 NRC Public Meeting - NEI Slides
ML20160A137
Person / Time
Site: 00000689
Issue date: 06/08/2020
From: Ashkeboussi N, Holtzman B
Nuclear Energy Institute
To: Leslie Fields
Licensing Processes Branch
Fields L
References
Download: ML20160A137 (4)


Text

©2020 Nuclear Energy Institute Nima Ashkeboussi, NEI Ben Holtzman, NEI Regulatory Guidance on New and Spent Fuel Pool Criticality Analyses June 8th, 2020

©2020 Nuclear Energy Institute 2

  • NEI 12-16 and the EPRI Benchmarks provide the basis for stable regulatory framework

- Preliminary Draft NRC Regulatory Guide endorses with clarifications NEI 12-16 Rev 4

  • Industry and NRC have spent significant efforts to reach this milestone but we must push this issue to completion

- Clear schedule for process moving forward

- Issue Draft Regulatory Guide for public comment

- Finalize and issue guidance Historical Perspective

©2020 Nuclear Energy Institute 3

  • Pleased with the preliminary draft

- No showstoppers that should delay publishing the document for public comments

  • Industry recommends removing exemption A as it should not be part of double contingency principle

- If new installation, CSA is submitted prior to installation modelling actual conditions

- If identified after installation

  • If manufacturing defect, Part 21 and Appendix B
  • If installation error, Appendix B, CAR, reporting to NRC, compensatory actions Initial Industry Feedback

©2020 Nuclear Energy Institute 4 Questions?

© 2018 NEI. All rights reserved.

Questions