Letter Sequence Other |
---|
|
|
MONTHYEARML20156A1512020-06-24024 June 2020 R. E. Ginna Nuclear Power Plant - Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID L-2020-LLE-0099 (COVID-19)) Project stage: Other 2020-06-24
[Table View] |
Similar Documents at Ginna |
---|
Category:Exemption from NRC Requirements
MONTHYEARML24010A2072024-01-25025 January 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - December 2023 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML21330A0422021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (Letter) ML21330A0432021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (FRN) ML21344A2062021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (Exemption) ML21293A1332021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21279A1122021-10-0606 October 2021 R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c ML21267A0132021-09-28028 September 2021 R. E. Ginna Nuclear Power Plant- Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0042 (COVID-19)) ML21265A1592021-09-21021 September 2021 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML21063A0152021-04-14014 April 2021 Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML21063A0042021-04-14014 April 2021 Letter, Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML20330A2912020-12-10010 December 2020 R. E. Ginna Nuclear Power Plant - Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0202 (COVID-19)) NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency2020-11-13013 November 2020 Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency NMP1L3351, and Nine Mile Point Nuclear Station, Unit 1 - Request for Exemptions from 10 CFR 2.109(b)2020-09-11011 September 2020 and Nine Mile Point Nuclear Station, Unit 1 - Request for Exemptions from 10 CFR 2.109(b) ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20156A1512020-06-24024 June 2020 R. E. Ginna Nuclear Power Plant - Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID L-2020-LLE-0099 (COVID-19)) ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML17131A1132017-06-21021 June 2017 R. E. Ginna Nuclear Power Plant - Transmittal Letter Re. Exemption from Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Clad Fuel Rods 2024-01-25
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
7 June 24, 2020 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - TEMPORARY EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR PART 73, APPENDIX B, GENERAL CRITERIA FOR SECURITY PERSONNEL (EPID L-2020-LLE-0099 [COVID-19])
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has approved the below temporary exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Appendix B,Section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties, for the R. E. Ginna Nuclear Power Plant (Ginna). This action is in response to Exelon Generation Company, LLCs (Exelon or the licensee) application dated June 8, 2020 (Agencywide Documents Access and Management System Package Accession No. ML20161A147 (non-public, withheld under 10 CFR 2.390)),
that requested a temporary exemption from 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1), regarding annual force-on-force (FOF) exercises.
The requirements in 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1), state, in part:
Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least . . . one (1) force-on-force exercise on an annual basis.
Force-on-force exercises conducted to satisfy the NRC triennial evaluation requirement can be used to satisfy the annual force-on-force requirement for the personnel that participate in the capacity of the security response organization.
The purpose of the annual licensee-conducted FOF exercise is to ensure that the site security force maintains its contingency response readiness. Participation in these exercises also supports the requalification of security force members.
On January 31, 2020, the U.S. Department of Health and Human Services declared a Coronavirus Disease 2019 (COVID-19) public health emergency (PHE) for the United States.
Subsequently, the Centers for Disease Control and Prevention issued recommendations (e.g.,
social distancing, limiting assemblies) to limit the spread of COVID-19.
B. Hanson Exelons application dated June 8, 2020, states the following:
Ginna is specifically requesting a temporary exemption from the requirement to perform a FOF exercise on an annual basis. However, Ginna will continue performing the quarterly tactical response drills/exercises and is not requesting an exemption from these requirements at this time.
This temporary exemption supports isolation restrictions (e.g., social distancing, group size limitations, self-quarantining, use of personal protective equipment, etc.) necessary to protect required site personnel in response to the 2020 COVID-19 virus.
These restrictions are needed to ensure personnel are isolated from the COVID-19 virus and remain capable of maintaining plant security.
On March 7, 2020, the Governor of the State of New York issued a disaster declaration in response to the spread of the COVID-19 and imposed isolation and other restrictions throughout the state. Since that time, Ginna has implemented isolation restrictions and other precautions for the protection of site personnel. The noted isolation restrictions being imposed remain in effect and are expected to continue since no timeframe has been identified for relaxing the restrictions.
Ginna will maintain a list of the names of the individuals who will not meet the requalification requirements and will include the dates of the last qualification.
Ginna will ensure contingency response readiness of security personnel not participating in an annual FOF exercise by conducting the scenario-based evolution: a lessons-learned review of a past exercise.
Ginna will complete the FOF exercise, within the time period in this request, when isolation restrictions are ended.
Ginna will schedule dates for completing any missed annual FOF drills/exercises within the time period of this request.
Ginna will begin implementing COVID-19 PHE controls for managing personnel performing security program duties upon NRC approval of its request.
This temporary exemption will apply to specific Ginna security personnel who have previously demonstrated proficiency and are currently qualified in accordance with the requirements in 10 CFR Part 73, Appendix B, Section VI. Exelon also stated that because of the rigorous nature of Ginna nuclear security personnel training programs, which consist of regularly scheduled training activities to include weapons training, contingency response drills and exercises, and demonstrated acceptable performance of day-to-day job activities (e.g., detection and assessment, patrols, searches, and defensive operations), it is reasonable to conclude that security personnel will continue to maintain their proficiency even though the requalification periodicity is temporarily exceeded. Additionally, Exelon stated that the site-specific COVID-19 PHE controls listed above will be implemented at Ginna to ensure impacted security personnel maintain their proficiency. Exelon requested that the duration of the exemption be 90 days after the PHE is ended, or until December 31, 2020, whichever occurs first, consistent with the NRC
B. Hanson staffs April 20, 2020, letter discussing planned activities related to the requirements for 10 CFR Part 73, Appendix B, Section VI, during the PHE (ADAMS Accession No. ML20105A483).
Pursuant to 10 CFR 73.5, Specific exemptions, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 73 when the exemptions are authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 that is authorized by law. The NRC staff has reviewed the exemption request and finds that granting the proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or other laws. Therefore, the NRC staff finds that the exemption is authorized by law.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 when the exemption will not endanger life or property or the common defense and security. This exemption will only apply to Ginna security personnel who are already satisfactorily qualified on the security requirements in 10 CFR Part 73, Appendix B, Section VI.
Based on this fact and its review of the controls Exelon will implement for the duration of the exemption, including a lessons-learned review of past exercise, continuing to conduct required quarterly tactical response drills, and completing the FOF exercise within the time period in this request, the NRC staff has reasonable assurance that the security force at Ginna will maintain its proficiency and its readiness to implement the licensees protective strategy and adequately protect the site. Therefore, the NRC staff concludes that the exemption would not endanger life or property or the common defense and security.
In accordance with 10 CFR 73.5, the Commission may grant an exemption from the regulations in 10 CFR Part 73 when the exemption is in the public interest. Participation in FOF exercises places site security personnel in close proximity to one another. Such proximity has the potential to increase the likelihood of security personnel being exposed to the COVID-19 virus.
The NRC staff finds that the temporary exemption from the annual FOF requirement in 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1), would facilitate the licensees efforts to maintain a healthy workforce capable of operating the plant safely and implementing the sites protective strategy by isolating security personnel from potential exposure to the COVID-19 virus. The NRC staff concludes that granting the temporary exemption is in the public interest because it allows the licensee to maintain the required security posture at Ginna, while enabling the facility to continue to provide electrical power to the Nation.
Environmental Considerations NRC approval of this exemption request is categorically excluded under 10 CFR 51.22(c)(25),
and there are no special circumstances present that would preclude reliance on this exclusion.
The NRC staff determined, per 10 CFR 51.22(c)(25)(vi)(E), that the requirements from which the exemption is sought involve education, training, experience, qualification, requalification, or other employment suitability requirements. The NRC staff also determined that approval of this exemption request involves no significant hazards consideration because it does not authorize any physical changes to the facility or any of its safety systems, nor does it change any of the assumptions or limits used in the facility licensees safety analyses or introduce any new failure modes. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite because this exemption does not affect any effluent release limits as provided in the facility licensees technical specifications or by the regulations
B. Hanson in 10 CFR Part 20, Standards for protection against radiation. There is no significant increase in individual or cumulative public or occupational radiation exposure because this exemption does not affect limits on the release of any radioactive material or the limits provided in 10 CFR Part 20 for radiation exposure to workers or members of the public. There is no significant construction impact because this exemption does not involve any change to a construction permit and no significant increase in the potential for or consequences from radiological accidents because this exemption does not alter any of the assumptions or limits in the facility licensees safety analysis. In addition, the NRC staff determined that there would be no significant impacts to biota, water resources, historic properties, cultural resources, or socioeconomic conditions in the region. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the approval of this exemption request.
Conclusions Accordingly, the NRC has determined that pursuant to 10 CFR 73.5, the exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. Therefore, the Commission hereby grants the licensees request to temporarily exempt Ginna from the annual FOF exercise requalification requirement of security personnel in 10 CFR Part 73, Appendix B, Section VI, subsection C.3.(l)(1). This exemption expires 90 days after the end of the PHE, or December 31, 2020, whichever occurs first.
If you have any questions, please contact the Ginna project manager, V. Sreenivas, at 301-415-2597 or V.Sreenivas@nrc.gov.
Sincerely, Digitally signed by Craig Craig G. G. Erlanger Date: 2020.06.24 Erlanger 14:05:04 -04'00' Craig G. Erlanger, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 cc: Listserv
ML20156A151 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NSIR/DPCP/RSB/BC NAME VSreenivas LRonewicz ABowers (LCubellis for)
DATE 06/10/2020 06/10/2020 06/16/2020 OFFICE OGC - NLO NRR/DORL/LPL1/BC NRR/DORL/D NAME JBielecki JDanna CErlanger DATE 06/19/2020 06/24/2020 06/24/2020