JUN 101988 SGTB:CEW 71-9074 ANEFC0 Incorporated ATTN: Dr. John D. Murphy, Sr.
P.O. Box 433 Ridgefield, CT 06877 Gentlemen:
This refers to your application dated February 29, 1988, requesting renewal of Certificate of Compliance No. 9074 for the Model No. AP-100 packaging.
In connection with our review, we need the information identified in the enclosure to this letter.
The information requested should be submitted within 30 days from the date of this letter. The information requested by this letter should be submitted in the form of revised pages.
If you have any questions regarding this matter, we would be pleased to meet with you and your staff.
Sincerely, Oririnal siscol by (FARIJS X. N Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, HMSS
Enclosure:
As stated DISTRIBUTION:
NRC File Center PDR' Region I CEWilliams CRChappell NMSS r/f SGTB r/f 8806210316 000610 PDR ADOCK 07109074 PDR C
OFC: SGTE 4
- 5GTjB,
- 5GTB n y
g / -.-----
[-
q.-----------.--------------------.------
NAME:CEWilliams:CRChappell:CEM cDonald:
DATE:06/0?/88
- 06/M88 :0 M /88 0FFICIAL RECORD COPY
W) 5 i
ANEFCO, Incorporated Model No. AP-100 Packaging Docket No. 71-9074 Encl to ltr dtd:
JUN 101988 14.0 Operating Procedures Loading Procedure 1.
In Section II the reference to 49 CFR should cite the section numbers given in the latest issue of 49 CFR Parts 100 to 177.
2.
In Section III a statement should be made regarding the need to make a determination that closure seal replacement is current with the seal replacement schedule.
3.
At an appropriate point in preparing the cask for loading, an inspection of 0-ring seals, sealing surfaces, and lid-bolts should be required.
4.
Attachment #1, referred to in Step 16, should be included with the operating procedures.
5.
An operation should be added after Step 16 requiring the application of a tamperproof feature as required by 10 CFR 971.43(b).
6.
Step 17 should refer to the requirements of 10 CFR 971.47.
7.
Step 18 should refer to the requirements of 10 CFR 671.87.
Unloading Procedure 1.
Section 1 should also cite the requirements of 10 CFR 671.89 Opening Instructions.
2.
Procedures to prepare to unloaded cask for shipment must consider the requirements of 49 CFR 173.427, "Empty Radioactive Materials Packaging."
15.0 AP-100 Maintenance Tests 1.
The maintenance program should include periodic testing, inr 9 tion and replacement schedules, as well as criteria for replacement a, repair of components such as closure bolts, tapped holes for closure bo..;, 0-ring seals, and sealing surfaces.
2.
The seal replacement schedule should be revised to agree with the requirements of Condition No. 8 of the certificate of compliance.
L
g
.s 4-u
,,6 l
2 Acceptance Tests If additional packagings are to be fabricated the application should contain a section on acceptance testing. The section should discuss the tests and inspections that will be performed prior to first use of the packaging (10 CFR 671.85). The.section should state the acceptance cri.teria for each test and inspection and the action to be taken if noncompliance is encountered.
I r
JUN 10 588 SGTB:CEW 71-9074 ANEFC0 Incorporated ATTN: Dr. John D. Murphy, Sr.
P.O. Box 433 Ridgefield, CT. 06877 Gentlemen:
' This refers to your application dated February 29, 1988, requesting renewal of Certificate of Compliance No. 9074 for the Model No. AP-100 packaging.
In connection with our review, we need the information identified in the enclosure to this letter.
The information requested should be submitted within 30 days from the date of this-letter. The information requested by this letter should be submitted in the form of revised pages.-
If you have any questions regarding this matter, we would be pleased to meet with you and your staff.
Sincerely, Origina181sowa by cauc48 E. MMDONGSB Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, NMSS
Enclosure:
As stated DISTRIBUTION:~
NRC : File.centef PDR Region I CEWilliams CRChappell HMSS r/f SGTB r/f
{
h 0FC: SGT ~~p( :5GT,p
- SGTB 1
1:
j
[_.q.....___..._____.....__.............__
NAME:CEWilliams:CRChappell:CEM cDonald:
DATE:0&O//88 :Qd/f/88 :0h7/88 l
ace'#,IAL RECORD COPY a
"5
or si ANEFC0, Incorporated Model No. AP-100 Packaging Docket No. 71-9074 Encl to ltr dtd: JUN 101988 14.0 Operating Procedures Loading Procedure 1.
In Section II the reference to 49 CFR should cite the section numbers given in the latest issue of 49 CFR Parts 100 to 177.
2.
In Section III a statement should be made regarding the need to make a determination that closure seal replacement is current with the seal replacement schedule.
3.
At an appropriate point in preparing the cask for loading, an inspection of 0-ring seals, sealing surfaces, and lid-bolts should be required.
4.
A.ttachment #1, referred to in Step 16, should be included with the operating procedures.
5.
An operation should be added after Step 16 requiring the application of a tamperproof feature as required by 10 CFR 671.43(b).
6.
Step 17 should refer to the requirements of 10 CFs 671.47.
7.
Step 18 should refer to the requirements of 10 CFR 971.87.
Unloading Procedure 1.
Section 1 should also cite the requirements of 10 CFR 671.89 Opening Instructions.
2.
Procedures to prepare to unloaded cask for shipment must consider the requirements of 49 CFR 173.427, "Empty Radioactive Materials Packaging."
'15.0 AP-100 Maintenance Tests 1.
The maintenance program should include periodic testing, inspection and replacement schedules, as well as criteria for replacement and repair of components such as closure bolts, tapped holes for closure bolts, 0-ring seals, and sealing surfaces.
2.
The seal replacement schedule should be revised to agree with the requirements of Condition No. 8 of the certificate of compliance.
I.
3
.g ei 2
Acceptance Tests If additional packagings are to be fabricated the application should contain a section on acceptance testing. The section should discuss the tests and inspections that will be performed prior to first use of the packaging (10 CFR 671.85). The section should state the acceptance criteria for each test and inspection and the action to be taken if noncompliance is encountered.
l l