Text
_ _ _ _ _ _ _ _ _ _ _ -. _ _. _ _.. _ _ _.. _... _ _ _ _ _..... _ _ _. _
O November 5, 1998 Mr. Lew W. Myers Vice President - Nuclear Centerior Service Company P.' O. Box 97, A200 Perry, OH '44081
Dear Mr. Myers:
~
In a telephone conversation on November 5,1998, between Mr. K. Meade and Mr. D. McNeil, arrangements were made for the administration of licensing examinations at the Perry Nuclear Power Plant the week (s) of March 15 & March 22,1999. In addition, the NRC will make an examination validation visit to your facility the week of March 1,1999.
The NRC will prepare the examinations based on the guidelines in Interim Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." in accordance with the guidelines in Attachment 5 of ES-201, your staff will be given the opportunity to review the examinations the week of March 1,1999.
To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by November 29,1999. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary 1
'for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302,
.your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget I
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
a L
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first l
examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has l-been completed should be submitted at least 14 days before the first examination date.
L l
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of l
Management and Budget, approval number 3150-0101, which expires on April 30,2000.
4 9811130154 981105 PDR ADOCK 05000440 V
L. Myers The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per respo including the time for reviewing instructions, gathering and maintaining the data needed, a completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washingt D.C. 20555-0001, or by Intemet electronic mail at BJSi@NRC. GOV; and to the Desk Office Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Managem and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Meade has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination i
procedures and guidelines, please contact Michael Bielby at 630-829-9762, or me at 630-829-9705.
i Sincerely, Original Signed by Melvyn Leach Melvyn N. Leach, Chief Operator Licensing Branch Docket No.: 50-440 License No.: NPF-58 cc:
H. Hegrat, Manager, Regulatory Affairs T. Rausch, Director, Quality and Personnel Development R. Schrauder, Director, Nuclear Engineering Departmen'.
W. Kanda, General Manager Nuclear Power Plant Department N. Bonner, Director, Nuclear Maintenance Department H. Bergendahl, Director Nuclear Services Department Ohio State Liaison Officer R. Owen, Ohio Department of Health C. Glazer, State of Ohio Pubhc Utilities Commission
' E. M. Root, Training Department DOCUMENT NAME: G:DRS\\PER11058.WPD l
- r. -.w.. con a w. ooewn.ne. inse
, e. w c. c6%u.nw...u r. cw we.n.*n.nv.nce. v. w cw l
OFFICE Rlli lW R!ll lf l
NAME McNeil:Jp b Leach # 5 4, DATE 11/0998 11/fl98 OFFICIAL RECORD COPY
r-L. Myers.
i Distribution 1
l Docket File '
l
' PUBLIC IE-42 i
- SRI, Perry L
~ T. J. Kozak, DRP i.
- R M. Gallo, NRR/HOLB l
D. V. Pickett, LPM, NRR l
. M. A. Bies, Rlll 1
1 i.
b l.
g
--