Text
.
/p8 [Mug\\
UNITED STATES
NUCLEAR REGULATORY COMMISSION
4
8
'n
REGION lli
j
r
r
801 WARRENVILLE ROAD
'
"
LISLE, ILLINOls 60532 4351
4,
,o
November 7, 1998
,
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
LASALLE INSPECTION REPORT 50-373/98021(DRP); 50-374/98021(DRP)
Dear Mr. Kingsley:
-
This refers to the inspection conducted September 1 through October 9,1998, at the
LaSalle Nuclear Power Station. The purpose of the inspection was to determine whether
activities authorized by the license were conducted safely and in accordance with NRC
requirements. At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
Overall, performance at the LaSalle Station was acceptable. In particular, inspectors observed
operators attentive to the main control room panels, knowledgeable of system configurations,
and aware of plant activities. Operators also responded appropriately to plant events.
However, several minor human performance errors occurred by operators and maintenance
personnel as a result of inattention to detail and ineffective communication. For example,
operator errors while removing equipment from service resulted in a failure to sample for
radioactivity before draining a primary containment chiller to a non-contaminated fire sump,
exposure of a reactor water cleanup pump's motor internals to excessive temperature, and
placement of the incorrect out-of-service cards on reactor building closed cooling water pump
motor switches. Also, maintenance personnel did not adequately protect the fuel pool cooling
and demineralizer system from the introduction of foreign material during a maintenance
activity. These and other examples in the enclosed report indicate that continued management
attention is warranted in the area of human performance.
\\
\\
9811130116 981107
ADOCK 05000373
G
-.
.
-.
.
.
. - .
.
.
.
.
l
O. Kingsley
-2-
1
1
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
1
Original signed by
'
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-373;50-374
Enclosure:
Inspection Report 50-373/98021(DRP);
50-374/98021(DRP)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Regulatory Services Manager
D. Greene, Licensing Director
'
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager
P. Barnes, Regulatory Assurance Supervisor
R. Hubbard
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: GVasaVas98021.drp
To receive a copy of this document. Indcate in the box "C" = Copy without attachtnant/ enclosure "E" = Copy with attachment / enclosure "N" = No
copy
OFFICE
Rlli
l0
Rlli
lM
Rlli
l
l
NAME
Hills (LDf k
Lanksbury RhP,
Grant O U-
DATE
11/6/98
11/l,/98
11/7/96/ (
"
OFFICIAL RECORD COPY
i
./
r
i
.
O. Kingsley
-3-
Distribution:
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/ encl
J. Caldwell, Rlli w/enci-
C. Pederson, Rlli w/ enc!
i
B. Clayton, Rill w/enci
j
SRI LaSalle w/enci
DRP w/ encl
TSS w/enci
DRS (2) w/enci
Rill PRR w/enci
PUBLIC IE-01 w/enci -
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
.
g
e
.t s .
-
- -