r
~
4-f1CD'S e
sum sumuus fi) thin 1d GdK Wd M b lptM)f y p 39 uma 9 r, \\9 But D Wens Vre Peht y g.',, I May 8, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek CA 94596-5368
Dear Sir:
13 Bulletin 85-03: Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings In accordance with Item (e) of the subject bulletin, a report is to be submitted to the NRC by May 15, 1986. This letter provides you with a brief status of our effort to develop the information for the report
)
and to inform you that a complete report will be submitted no later than July 15, 1986.
Portland Ceneral Electric has participated in the Westinghouse Owners l
Group (WOG) Program for determining the methodology to assure that the I
maximum differential pressure is identified for each motor-operated I
valve subject to the requirements of the bulletin. The completed WOG Program was received by PGE on April 17, 1986.
This information is currently being used by our architect-engineer (Bechtel) to develop the information required by Item (a) of the bulletin. This work by Bechtel is scheduled for completion by May 15, 1986.
8605270212 860508 PDR ADOCK 05000344 G
PDR Ep)
'21 S W Samen Etra Mn1. O egan 97204 f
o
?. l
Portland General ElechicCoirony Mr. John B. Martin May 8, 1986 Page 2 Upon completion of the Bechtel work, our Plant engineers will determine the scope and content of the program that will be responsive to Items (b) through (d) of the bulletin. A description of this program and a schedule for completion of all items by no later than November 15, 1987, will be provided in the report to be submitted by July 15, 1986.
Sincerely, s
h "fd
- Bart D. Withers Vice President Nuclear c:
U.S. Nticlear Regulatory Commission Document Control Desk Mr. Lynn Frank, Director State of Oregon Department of Energy l