Informs of Status of Rept on motor-operated Valves in Response to IE Bulletin 85-003.Complete Rept Will Be Submitted by 860715
ML20155J829
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/08/1986
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-85-003, IEB-85-3, NUDOCS 8605270212
Download: ML20155J829 (2)


Text

r

~

4-f1CD'S e

sum sumuus fi) thin 1d GdK Wd M b lptM)f y p 39 uma 9 r, \\9 But D Wens Vre Peht y g.',, I May 8, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek CA 94596-5368

Dear Sir:

13 Bulletin 85-03: Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings In accordance with Item (e) of the subject bulletin, a report is to be submitted to the NRC by May 15, 1986. This letter provides you with a brief status of our effort to develop the information for the report

)

and to inform you that a complete report will be submitted no later than July 15, 1986.

Portland Ceneral Electric has participated in the Westinghouse Owners l

Group (WOG) Program for determining the methodology to assure that the I

maximum differential pressure is identified for each motor-operated I

valve subject to the requirements of the bulletin. The completed WOG Program was received by PGE on April 17, 1986.

This information is currently being used by our architect-engineer (Bechtel) to develop the information required by Item (a) of the bulletin. This work by Bechtel is scheduled for completion by May 15, 1986.

8605270212 860508 PDR ADOCK 05000344 G

PDR Ep)

'21 S W Samen Etra Mn1. O egan 97204 f

o

?. l

Portland General ElechicCoirony Mr. John B. Martin May 8, 1986 Page 2 Upon completion of the Bechtel work, our Plant engineers will determine the scope and content of the program that will be responsive to Items (b) through (d) of the bulletin. A description of this program and a schedule for completion of all items by no later than November 15, 1987, will be provided in the report to be submitted by July 15, 1986.

Sincerely, s

h "fd

  • Bart D. Withers Vice President Nuclear c:

U.S. Nticlear Regulatory Commission Document Control Desk Mr. Lynn Frank, Director State of Oregon Department of Energy l

Subscribed and sworn to before me this 8th day of May 1986.