ML20155J732

From kanterella
Jump to navigation Jump to search
Advises That LER Re Auxiliary Feedwater Sys Aligned to Assured Source During Testing Will Be Delayed Until 880713. All Concerns Surrounding Incident Have Not Yet Been Resolved
ML20155J732
Person / Time
Site: Mcguire
Issue date: 06/13/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806210018
Download: ML20155J732 (1)


Text

-

~~

p, DUKE POWEn Gonam-P.O. DOX 03180 GIIARLOTTE. N.C. 20242 TE LE PIIONE

!!AL H. RICKER (704) 373-453t vaca raassment WUCLeAR PROOt'CTION June 13, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

McGuire Nuclear Station Unit 2 Docket No. 50-370 Gentlemen:

On May 12, 1988, the auxiliary feedwater system was aligned to its assured (nuclear service water system) during testing.

This was reported to source tiie NRC per 10 CFR 50.72 b.2. (ii) and is reportable per 10 CFR 50.73 a.2. (iv),

with the Licensee Event Report due June 13, 1988.

All concerns surrounding this incident have not yet been resolved; consequently the LER will be delayed until July 13, 1988.

Very truly yours,

/

.Hal B. Tucker JBD/273/ bhp cc:

Dr. J. Nelson Grace American Nuclear Insurers Regional Administrator, Region II c/o Dottie Sherman, ANI Library U.S. Nuclear Regulatory Commission The Exchange, Suite 245 101 Marietta St., NW, Suite 2900 270 Farmington Avenue Atlanta, GA 30323 Farmington, CT 06032 INPO Records Center Mr. Darl Hood U.S. Nuclear Regulatory Commission Suite 1500 Office of Nuclear Reactor Regulation 1100 circle 75 Parkway Atlanta, GA 30339 Washington, D.C.

20555 M&M Nuclear Consultants Mr. W.T. Orders 1221 Avenue of the Americas NRC Resident Inspector New York, NY 10020 McGuire Nuclear Station l

I O 8806210018 880613 PDR ADOCK 05000370 S

DCD

__.