MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056G0561993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Planned Installation of Certain Analog to Digital Retrofit Modifications During Refueling Outage Scheduled to Begin 930918 ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056G0561993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Planned Installation of Certain Analog to Digital Retrofit Modifications During Refueling Outage Scheduled to Begin 930918 ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] |
Text
. . .. .
. October 20, 1988 Docket No. 50-277/278 MEMORANDUM FOR: Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II FROM: Robert E. Martin, Project Manager Project Directorate I-2 :
Division of Reactor Projects I/II
SUBJECT:
FORTHCOMING MEETING WITH PHILADELPHIA ELECTRIC CO. ON ;
PEACH BOTTOM, UNITS 2 AND 3 t DATE & TIMt': November 2, 1988 r 1:00 - 5:00 pm LOCATION: One White Flint North .
Room 14B11 2
Rockville, Maryland L i
PURPOSE: To discuss revisions to the Quality Assurance Program in Revision 6 to the updated FSAR and, as time permits, the i items on leak rate testing as listed in the enclosure.
- PART!CIPANTS: NRC Utility ,
- 7. Spraul B. Birely i R. Martin i i
/s/ '
- Robert E. Martin, Project Manager j Project Directorate I-2
, Division of Reactor Projects I/II l l
4
Enclosure:
As stated cc: See next page !
i
+ l l l
- Meetings between NRC technical staff and applicants or licensees are open for (
interested members of the public, petitioners, interver. ors, or other parties !
to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy " (
- 43 3 deral Register 28058,6/28/78. !
- i Ph PDI-2/D f
,Ma! $MV rtin:mr WButler 1
1 j l p/0/ F/88 3 /88
\o
)
l 8G10260405 881020 PDR ADOCK 05000277 9 i PDC [
P L
e
- ',, UN11 ED STA TES
[*
y g
j NUCLEAR REGU.ATORY COMMISSION WASHIN( TON, D. C. 20655
% # Oct,ter 20, 1988
% e , . . . **'
bucket No. 50-277/278 .
MEMORANDUM FOR: Walter R. Butler, Director Proja::t Directorate I-2 Division of Reactor Projects I/II FROM: Robert E. Martin, Project Manager Project Directorate I-2 Division of Reactor Projects 1/II
SUBJECT:
FORTHCOMING MEETING WITH PHILA0fLPHIA ELECTRIC CO. ON ,
PEACH BOTTOM, UNITS 2 AND 3 '
DATE & TIME: Novembcr 2, 1988 1:00 - 5:00 pm LOCATION: One White Flint North Room 14B11 Rockville, Maryland PURPOS'E: To discuss revisions to the Quality Assurance Program in Revisien 6 to the updated FSAR and, as time permits, the items on leak rate testing as listed in the enclosure.
- PARTICIPANTS: NRC titility l F Spraul B. Birely R. Martin
't
'Mv ik y R E. Martin, Project Manager .
Project Directorate I-2 l
' Division of Reactor Projects I/I! ;
Enclosure:
I As stated j cc: See next page i
- Meetings between NRC technical staff and applicants or licensees are open for ;
interested members of the public, petitioners, intervenors, or other parties !
to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
43 Federal Regi<ter, 28058, 6/28/78.
i i
Mr. William M. Alden Peach Bot +om Atovite Power Station, Philadelphia Electric Company UM ts 2 and 3 CC:
Troy 8. Conner, Jr. , Esq. Mr. R. A. Heiss, Coordinator 1747 Pennsylvania Avenue, N.W. Pennsylvania State Clearinghouse Washington, D.C. 20006 Governor's Office of State Planning and Development Philadelphia Electric Company P. O. Box 1323 ATTN: Mr. D. M. Smith, Vice cresident Harrisburg, Pennsylvania 17120 Peach Bottom Atomic Power St::1cn Route 1. Box 208 Mr. Thomas M. Gerusky, Director Delta, Pennsylvania 17314 Bureau of Radiation Protection Pennsylvania Department of H. Chris Schwem Environmental Resources Vice President, Production P. O. Box 2063 Atlantic Electric Harrisburg, Pennsylvania 17120 P.O. Box 1500
, 1199 Black Horse Pike Mr. Albert R. Steel, Chairman Pleasantville, New Jersey 08232 Board of Supervisors Peach Bottom Township >
Resident"Inspector R. D. #1 U.S. Nuclear Regulatory Comission Delta, Penr.sylvania 17314 Peach Botten Atomic Power Statice P.O. Box 399 Pr. Gary Mock Delta, Pennsylvania 17314 P. O. Box 09131 Colurrbus, Ohio 43209 Regional Administrator, Region !
U.S. Nuclear Regulatory Commission Delmarva Power and Light Company l 475 Allendale Road c/o Jack Urban King of Prussia, Pennsylvania 19406 General Hansger, Fuel Supply '
800 Kina Street '
Mr. Bryan W. Gorman P.O. Box 231 Manager - External Affairs Wilmington, DE 19899 Public Service Electric & Gas Company P.O. Box 236, N?8 Mr. Tom Magette Hancocks Bridge, New Jersey 08038 Power Plant Research Prograin Department of Natural Resources B-3 Tawes State Office Building Annapolis, Maryland 21401 Mr. Roland Fletcher Department of Environment ,
201 West Preston Street Baltimore, Maryland 21201 e
w e
ENCIf6URE Agenda for Meeting Relating to 10 CFR Part 50 Appendix J Leak Tests Based on the staff's review of the licensee's prnposed TS changes (10/10/86 submittal) on 10 CFR 50, Appendix J 1eak rate test requirements for Peach Bottom Units 2 and 3 some of the proposed changes need further clarification.
Please be prepared to discuss how these matters are dealt with at Peach Bottom.
- 1. Surveillance Requirements (SR) 4.7.A.2, TS Page 167 l
Definition Proposed: of P P,'ap(proposed versus Appendix J Wording) l Appendix J: t p= = propriately measured reduced test pressuretest (psig) pressures (psig) t d
- 2. SR 4.7.A.P.C.2. TS Page 167 1
3 Omission of specific criterion for the conduct of the third test of each set (Apper.Jix J, item !!!.D.1.a) in the proposed TS.
1
- 3. SR 4.7.A.2.e TS Pages 168 and 16Ra a .' ' Omission of Additional Renuirements for failing to meet the l
- applicable acceptance criteria for Type A test leak rates (Appendix l 1 J. Items Ill.A 6.a and b) in the proposed TS. l
- b. Omission of Supplemental Test criteria for verifying the accuracy of ,
any Type A test (Appendix J, item lit.A.3.b) in the proposed TS. !
- 4. SR 4.7 A.?.f, TS Page 169
- a. Clarification relating to isolation valves in hydrostatically tested i lines that penetrate the containment and additionally satisfy Appendix J. Item III.C.3, if applicable,
- b. Clarification on Action to be taken in the event leak rate (0.60L ) i is not met. Specifically, the applicability of Action specified in Spec. 3.7.A.3 with regard to the above criterion. !
- 5. SR 4.7 A.2 - General !
- a. Omission of Special Testing Requirements following containment
] modification (Appendix J. Item IV.A) from the proposed TS. ,
- b. Omission of Reporting Dequirements (Appendix J. Item V.B) from the >
j proposed TS. !
/ ;
l -
I
1
- 6. Note 6 tr TS Table 3.7.2. TS Page 188
- Testing Interval for Type B Tests
- Omission of Type O testing requirements following containment :
1 opening subsequent to a Type A or R test (Appendix J Item III.D.2.a) l
- 7. Note 7 to TS Table 3.7.2, TS Page 188 - Personnel Air locks i
- a. Omission of air lock seal testing within 3 days after opening the airlock and the test pressure and leak rate criteria for seal !
testing (Appendix J. Item III.D.2.b (iii)) from the proposed TS.
^
- b. Omission of overall airlock leak rate (Appendix J Item !!!.D,2.b(iv)) !
- c. Identification of exemption to Appendix J. Item III.D 2.b(ii) with i
regard to air lock testing.
- 8. N3 te.9.to TS Table 3.7.4. TS Page 188
. Testing by applying pressure between the inboard and outboard isolation valves. ;
- a. Clarification un r. mission of applicability of Note 9 in the proposed TS for all the isolation valves associated with penetrations 9A, i 9813A, 138, 16A and 168 (Existing TS applies Note 9).
- b. Clarification on the discrepancy in the listing of the valves l 4
associated with the above penetrations between the existing and i proposed TS Tables. I
- 9. Notes 10, 11, 12, 21 and 22 to TS Table 3.7.4, TS Pages 188a, b and c l
- Reverse Direction Testing for Gate valves (Note 10); Globe Valves l (Note 11); Butterfly valves (Notes 12 and 22); Inboard manual gate l l valves (Note 21).
{
- a. Schematics of valve assemblies showing individual components to }
1 demonstrate acceptability of reverse direction testing, j
- 10. Note 13 to TS Table 3.7.4, TS Page 188a Clarification on whether the six globe valves of the ILRT system which are j i locked closed except during ILRT's will be tested during the Type A tests.
- 11. Notes 15 and 17 to TS Table 3.7.4. TS Pages 188b and c 1
Water covered Torus h olation Valves l l 1 l
l l
. ..- i
- a. Clarification on interim tasting (until proposed anti-siphon devices are sealed) for the check valves IF - 10, 23-13, 10 -19A. C and 10
- 19 8 and D.
- b. Identification of Unit 2 Water - covered discharge lines in the !
suppression chamber that currently hava anti-siphon devices which permit their direct comunication with the gas space above the I suppression pool and the interim testa for the associated valves. i
- 12. Miscellaneous f
- a. Clarification relating to discrepancy between the existing and the '
proposed TS Tables 3.7.4 for the following-Penetration Number Valve Existing Proposed i
- A0-2502A; A0-3502A 2058 25 I
- ,A0.-2505; A0-3505 25 205B L
- A0-2519; A0-3519 25 2058 -
l A0-2520; A0-3520 PS 2058 l A0-2521A; A0-3521A 25 2058 !
A0-2521B; A0-35?lB 25 2058 A0-2523; A0-3523 25 205B !
A0-4521; A0-5241 212 214 A0-4247; A0-5247 214 2178
. A0-4242; A0-5248 214 217B 1 b. Clarification on the omission of the following valves from the
! proposed TS Table 3.7.4 (these are listed in the existing TS Taole j 3.7.4):
Penetration No. 211A: SV - 49508 and SV - 59508 I
- Penetration No. 2118: SV - 4950A and SV - 5950A
- c. Clarification relating to the listing of the following penetrations !
- only in the proposed TS Table 3.7.4
Penetration Nos.: 21, 23, 24. 52F. 53 - 56, 210A and 2108 l
- d. Exemption Requests for Reverse Direction Testir<i l i
- Clarification as to why such requests have been made for certain !
l valves (covered by Notes 10, 13, 16 and 21) but not for other va'ves l J { covered by Notes 11. 12, 20 and 22). I i
l i !
j l ,
i i 1 .
! l i <
d i
MEETING NOTICE DISTRIBUTION
'9BOiet3he',)
NRC PDR Local PDR PDI-2 Reading T. Murley J. Snierek i D. Crutchfield S. Varga B. Boger W. Butler R. Martin f R. Clark !
, W. Lanning OGC l E. Jordan 4
~
R. Grimes .
Receptionist (White Flint) '
NRC Participants ,
ACRS (10) ;
GPA/PA
- V. Wilson" i L. Thomas-
. H. B. Clayton
- M. O'Brien i T. Chandrasekaran !
- T, L.n 6 t il t i j cc: Licensee / Applicant & Service List l j ,
i i 4 I l l i
- i I 4 1
4 f
I l l 1 :
i
. t
i l . !
l I
i .
a
,